Item 35
approved contractJan 18, 2023
Description
Authorize the Bureau of Highway Design to retroactively amend a contract with BETA Group, Inc., Manchester, NH (originally approved by G&C on 11/6/19, Item#15), for preliminary design of improvements to approximately three miles of NH Route 125 in the Town of Epping, by extending the completion date from November 30, 2022 to November 30, 2024. Effective upon G&C approval. Time extension only, no additional funding.
Vote Record
approved
Motion by Stevens, seconded by Wheeler acted as follows
Joseph Kenney
(R)
yes
Cinde Warmington
(D)
yes
Janet Stevens
(R)
yes
Ted Gatsas
(R)
yes
Dave Wheeler
(R)
yes
Documents (1)
Item_35.pdf
Open in new tab →