Item 60
approved contract late itemJun 24, 2020
Description
Authorize the Bureau of Bridge Design to amend a contract with Vanasse Hangen Brustlin Inc., (originally approved by G&C on 8-26-15, item #30), to study and prepare preliminary engineering plans for rehabilitation or replacement of the General Sullivan Bridge carrying pedestrian and recreational traffic over Little Bay between the City of Dover and the Town of Newington, by retroactively extending the completion date from May 31, 2020 to December 31, 2020. No Additional Funding.
Department
DEPARTMENT OF TRANSPORTATION
Vendor
Vanasse Hangen Brustlin Inc., (originally approved by G&C on 8-26-15, item #30)
to study and prepare preliminary engineering plans for rehabilitation or replacement of the General Sullivan Bridge carrying pedestrian and recreational traffic over Little Bay between the City of Dover and the Town of Newington, by
Effective Dates
May 31, 2020 — December 31, 2020
Vote Record
approved
Motion by Cryans, seconded by Volinsky
Michael Cryans
(D)
yes
Andru Volinsky
(D)
yes
Russell Prescott
(R)
yes
Ted Gatsas
(R)
yes
Debora Pignatelli
(D)
yes
Documents (1)
Item_60.pdf
Open in new tab →