Meetings / Aug 13, 2025 / Item 15

Item 15

approved contract

Aug 13, 2025

Description

Authorize the Bureau of Construction to enter into a contract with Continental Paving, Inc., Londonderry, NH, on a basis of a low bid of $4,207,135.23 for resurfacing of eight sections of various Tier 3 and 4 roadways throughout thirteen towns in District 3 and 6 including: Rollinsford, Pittsfield, Barnstead, Gilmanton, Alton, Deerfield, Northwood, Strafford, Barrington, Rochester, South Hampton, Kensington, and Somersworth. (2) Further authorize a contingency in the amount of $210,356.76, for payment of latent conditions which may appear during the construction of the project. Effective upon G&C approval through September 25, 2026, unless amended by the Department in accordance with the Standard Specifications. 100% Federal Funds

Amount
$4.2M
$4,207,135.23, $210,356.76
Vendor
Continental Paving, Inc.
Londonderry, NH
Funding Source
100% Federal Funds
Vote Record approved
Motion by Kenney, seconded by Liot Hill acted as follows
Joseph Kenney (R) yes
Karen Liot Hill (D) yes
Janet Stevens (R) yes
John Stephen (R) yes
Dave Wheeler (R) yes

Documents (1)

Item_15.pdf Open in new tab →
← Back to Aug 13, 2025 meeting