Item 28A
approvedNov 25, 2019
Description
Authorize to decrease the rate of tolls at the F.E. Everett Turnpike Exit 11 ramp toll plazas in Merrimack to $0.00 for all vehicles. Effective January 1, 2020.
Department
DEPARTMENT OF TRANSPORTATION
Vote Record
approved
Michael Cryans
(D)
yes
Andru Volinsky
(D)
yes
Russell Prescott
(R)
yes
Ted Gatsas
(R)
yes
Debora Pignatelli
(D)
yes
Related Sub-Items (2)
28
Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for intersection improvements on NH Route 16 at NH Routes 25 and 49 in Ossipee, on the basis
$1.3M
approved
28
Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for intersection improvements on NH Route 16 at NH Routes 25 and 49 in Ossipee, on the basis
$1.3M
approved