Meetings / Jul 30, 2025 / Item 12

Item 12

approved contract

Jul 30, 2025

Description

Authorize the Bureau of Highway Design to retroactively amend a contract with HDR Engineering, Inc., Bedford, NH (originally approved by G&C on 7/15/20) for preliminary design of improvements to NH Route 1A (Ocean Boulevard) in the Town of Hampton, NH, by extending the completion date from March 31, 2025 to March 31, 2026. (2) Further authorize to increase the fee, in the amount of $644,186.29, from $2,228,720.15 to $2,872,906.44. Effective upon G&C approval. 100% Federal Funds

Amount
$2.9M
$644,186.29, $2,228,720.15, $2,872,906.44
Vendor
HDR Engineering, Inc.
Bedford, NH
Funding Source
100% Federal Funds
Effective Dates
March 31, 2025 — March 31, 2026
Vote Record approved
Motion by Liot Hill, seconded by Wheeler acted as follows
Joseph Kenney (R) yes
Karen Liot Hill (D) yes
Janet Stevens (R) yes
John Stephen (R) yes
Dave Wheeler (R) yes

Documents (1)

Item_12.pdf Open in new tab →
← Back to Jul 30, 2025 meeting