Meetings / Jun 20, 2018 / Item 58

Item 58

approved contract

Jun 20, 2018

Description

Authorize the Bureau of Construction to enter into a contract with A.J. Cameron Sod Farm Inc., Farmington, NH, for establishing Lilac beds along roadways throughout the State utilizing funds through the Moose Plate Program, on the basis of a low bid of $59,650. Effective upon G&C approval through October 26, 2018. 100% Agency Funds.

Amount
$59,650
$59,650
Vendor
A.J. Cameron Sod Farm Inc.
Farmington, NH
Funding Source
100% Agency Funds
Vote Record approved
Motion by Kenney, seconded by Wheeler voted to table
Joseph Kenney (R) yes
Andru Volinsky (D) yes
Russell Prescott (R) yes
Christopher Pappas (D) yes
Dave Wheeler (R) yes

Documents (1)

Item_58.pdf Open in new tab →
← Back to Jun 20, 2018 meeting