Meetings / Mar 7, 2018 / Item 26

Item 26

approved

Mar 7, 2018

Description

Authorize the Bureau of Bridge Design and the Pease Development Authority – Division of Ports and Harbors, to enter into a memorandum of agreement for up to $18,550,000 for final design and construction for the Functional Replacement of the Side Barge Wharf impacted by the replacement of the Sarah Mildred Long Bridge (NH Br. No. 251/110) carrying US 1 Bypass over the Piscataqua River between Portsmouth, NH, and Kittery, ME. Effective upon G&C approval and continuing through design, construction, inspection, and final acceptance of the completed project. 100% Federal Funds.

Amount
$18.6M
$18,550,000
Funding Source
100% Federal Funds
Vote Record approved
Motion by Prescott, seconded by Wheeler
Joseph Kenney (R) yes
Andru Volinsky (D) yes
Russell Prescott (R) yes
Christopher Pappas (D) yes
Dave Wheeler (R) yes

Documents (1)

Item_26.pdf Open in new tab →
← Back to Mar 7, 2018 meeting