Item 26
approvedMar 7, 2018
Description
Authorize the Bureau of Bridge Design and the Pease Development Authority – Division of Ports and Harbors, to enter into a memorandum of agreement for up to $18,550,000 for final design and construction for the Functional Replacement of the Side Barge Wharf impacted by the replacement of the Sarah Mildred Long Bridge (NH Br. No. 251/110) carrying US 1 Bypass over the Piscataqua River between Portsmouth, NH, and Kittery, ME. Effective upon G&C approval and continuing through design, construction, inspection, and final acceptance of the completed project. 100% Federal Funds.
Vote Record
approved
Motion by Prescott, seconded by Wheeler
Joseph Kenney
(R)
yes
Andru Volinsky
(D)
yes
Russell Prescott
(R)
yes
Christopher Pappas
(D)
yes
Dave Wheeler
(R)
yes
Documents (1)
Item_26.pdf
Open in new tab →