Meetings / Jun 7, 2017 / Item 50

Item 50

approved contract

Jun 7, 2017

Description

Authorize the Bureau of Bridge Maintenance to enter into a contract based on a single hourly rate bid with Northeast Integration LLC, Portsmouth, NH, in the amount of $75,000 to provide all labor, materials, equipment and transportation necessary to perform programmable logic controller services, for the State of NH, DOT, for work that includes maintenance, repairs, and system upgrades to control systems for the Sarah Mildred Long Bridge, the Memorial Bridge, and Various Bridges statewide. Effective July 1, 2017 through June 30, 2020. 73% Highway, 27% Other Funds.

Amount
$75,000
$75,000
Funding Source
73% Highway; 27% Other Funds
Vote Record approved
Motion by Pappas, seconded by Volinsky
Joseph Kenney (R) yes
Andru Volinsky (D) yes
Russell Prescott (R) yes
Christopher Pappas (D) yes
Dave Wheeler (R) yes

Documents (1)

Item_50.pdf Open in new tab →
← Back to Jun 7, 2017 meeting