Item 50
approved contractJun 7, 2017
Description
Authorize the Bureau of Bridge Maintenance to enter into a contract based on a single hourly rate bid with Northeast Integration LLC, Portsmouth, NH, in the amount of $75,000 to provide all labor, materials, equipment and transportation necessary to perform programmable logic controller services, for the State of NH, DOT, for work that includes maintenance, repairs, and system upgrades to control systems for the Sarah Mildred Long Bridge, the Memorial Bridge, and Various Bridges statewide. Effective July 1, 2017 through June 30, 2020. 73% Highway, 27% Other Funds.
Amount
$75,000
$75,000
Department
DEPARTMENT OF TRANSPORTATION
Funding Source
73% Highway; 27% Other Funds
Vote Record
approved
Motion by Pappas, seconded by Volinsky
Joseph Kenney
(R)
yes
Andru Volinsky
(D)
yes
Russell Prescott
(R)
yes
Christopher Pappas
(D)
yes
Dave Wheeler
(R)
yes
Documents (1)
Item_50.pdf
Open in new tab →