Item 24
approved contractMay 3, 2017
Description
Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing approximately 20 miles along the F.E. Everett Turnpike, as well as to construct improvements at the Exit 8 Park nā Ride in Nashua, NH, on the basis of a low bid of $2,757,515.27. Effective upon G&C approval through November 17, 2017. 100% Turnpike Funds for the resurfacing, 80% Federal Transit Administration with 20 % Turnpike match for the Exit 8 Park nā Ride improvements.
Amount
$2.8M
$2,757,515.27
Department
DEPARTMENT OF TRANSPORTATION
Funding Source
100% Turnpike Funds for the resurfacing; 80% Federal Transit Administration with
Vote Record
approved
Motion by Pappas, seconded by Volinsky
Joseph Kenney
(R)
yes
Andru Volinsky
(D)
yes
Russell Prescott
(R)
yes
Christopher Pappas
(D)
yes
Dave Wheeler
(R)
yes
Documents (1)
Item_24.pdf
Open in new tab →