Meetings / May 3, 2017 / Item 31B

Item 31B

approved contract

May 3, 2017

Description

Authorize the Bureau of Construction to enter into a contract with SUR Construction Inc., Rochester, NH, for a two-way left turn lane on NH Route 11 in Farmington for the entire length of the project, on the basis of a low bid of $1,426,765.15. (2)Further authorize a contingency in the amount of $99,873.57 for payment of latent conditions which may appear during the construction of the project. Effective upon G&C approval through October 27, 2017. 100% Federal Funds.

Amount
$1.4M
$1,426,765.15, $99,873.57
Vendor
SUR Construction Inc.
Rochester, NH
Funding Source
100% Federal Funds
Vote Record approved
Motion by Pappas, seconded by Volinsky
Joseph Kenney (R) yes
Andru Volinsky (D) yes
Russell Prescott (R) yes
Christopher Pappas (D) yes
Dave Wheeler (R) yes
Related Sub-Items (6)

Documents (3)

Item_31.pdf Open in new tab →
Item_31A.pdf (31A) Open in new tab →
Item_31B.pdf (31B) Open in new tab →
← Back to May 3, 2017 meeting