Item 33
approved contract late itemApr 19, 2017
Description
Authorize the Bureau of Construction to enter into a contract with Brox Industries Inc., Dracut, MA, for resurfacing of approximately 33 miles of mainline on the Blue Star and Spaulding Turnpike as well as the Seabrook Welcome Center, on the basis of a low bid of $3,539,442.62. Effective upon G&C approval through September 29, 2017. 100% Turnpike Funds.
Amount
$3.5M
$3,539,442.62
Department
DEPARTMENT OF TRANSPORTATION
Funding Source
100% Turnpike Funds
Vote Record
approved
Motion by Wheeler, seconded by Prescott
Joseph Kenney
(R)
yes
Andru Volinsky
(D)
yes
Russell Prescott
(R)
yes
Christopher Pappas
(D)
yes
Dave Wheeler
(R)
no
Dissenting: Wheeler
Related Sub-Items (2)
33A
Authorize an increase of $5,386.68 in the annual salary of unclassified position 9U576, Director, Agency Software Division, Michael O’Neil, salary grade HH, from $103,574.64 to $108,961.32 effective M
$108,961
approved
33A
Authorize an increase of $5,386.68 in the annual salary of unclassified position 9U576, Director, Agency Software Division, Michael O’Neil, salary grade HH, from $103,574.64 to $108,961.32 effective M
$108,961
approved