Meetings / May 6, 2015 / Item 34

Item 34

approved contract

May 6, 2015

Description

Authorize the Bureau of Construction to enter into a contract with R.S. Audley Inc., Bow, NH, for the replacement of the existing red-listed bridge carrying I-95 over the Taylor River, in the Towns of Hampton Falls and Hampton, on the basis of a low bid of $11,798,426.89. (2)Further authorize a contingency in the amount of $353,952.81 for payment of latent conditions which may appear during the construction of the project. Effective upon G&C approval through May 18, 2015. 100% Turnpike Funds.

Amount
$11.8M
$11,798,426.89, $353,952.81
Vendor
R.S. Audley Inc.
Bow, NH
Funding Source
100% Turnpike Funds
Vote Record approved
Joseph Kenney (R) yes
Colin Van Ostern (D) yes
Christopher Sununu (R) yes
Christopher Pappas (D) yes
Dave Wheeler (R) yes

Documents (1)

Item_34.pdf Open in new tab →
← Back to May 6, 2015 meeting