Item 28A
approvedOct 29, 2014
Description
Authorize the Bureau of Bridge Design to enter into an Interstate Bridge Agreement with the State of Maine to allow the Department of reimburse Maine for half of the costs totaling $173,000,000 associated with the replacement of the Sarah Mildred Long Bridge carrying US 1 Bypass over the Piscataqua River between Portsmouth, NH and Kittery, ME. Effective upon G&C approval through construction, inspection, and final acceptance of the complete project. (50% NH, 50% ME).
Vote Record
approved
Motion by Van Ostern, seconded by Pappas
Joseph Kenney
(R)
yes
Colin Van Ostern
(D)
yes
Christopher Sununu
(R)
yes
Christopher Pappas
(D)
yes
Debora Pignatelli
(D)
yes
Related Sub-Items (2)
28
Authorize the Bureau of Aeronautics to provide funding to the Pease Development Authority to design and permit the removal of on-airport obstructions (trees) at the Portsmouth International Airport at
$316,350
approved
28
Authorize the Bureau of Aeronautics to provide funding to the Pease Development Authority to design and permit the removal of on-airport obstructions (trees) at the Portsmouth International Airport at
$316,350
approved