Meetings / Aug 5, 2014 / Item 26B

Item 26B

approved contract consent calendar

Aug 5, 2014

Description

Authorize the Bureau of Bridge Maintenance to enter into a retroactive contract with Yates Electric Service Inc., Durham, NH, for electrical inspection, maintenance, repairs and system upgrades for the Sarah Long Bridge, Memorial Bridge, Hampton River Bridge, the Wentworth House Bridge, the I-95 High Level Bridge, and Various Bridges and Bridge Maintenance Facilities statewide, on the basis of a low bid of $300,000. Effective upon G&C approval through June 30, 2017. 66% Highway, 34% Agency Funds.

Amount
$300,000
$300,000
Vendor
Yates Electric Service Inc.
Durham, NH
Funding Source
66% Highway; 34% Agency Funds
Vote Record approved
Joseph Kenney (R) yes
Colin Van Ostern (D) yes
Christopher Sununu (R) yes
Christopher Pappas (D) yes
Debora Pignatelli (D) yes
Related Sub-Items (20)
26
Authorize the Bureau of Aeronautics to amend a grant to the Town of Whitefield (originally approved by G&C on 10-20-10, item #106), to conduct an environmental assessment for the Mt. Washington Region
approved
26
Authorize the Bureau of Aeronautics to amend a grant to the Town of Whitefield (originally approved by G&C on 10-20-10, item #106), to conduct an environmental assessment for the Mt. Washington Region
approved
26
Authorize the Bureau of Aeronautics to amend a grant to the Town of Whitefield (originally approved by G&C on 10-20-10, item #106), to conduct an environmental assessment for the Mt. Washington Region
approved
26
Authorize the Bureau of Aeronautics to amend a grant to the Town of Whitefield (originally approved by G&C on 10-20-10, item #106), to conduct an environmental assessment for the Mt. Washington Region
approved
26
Authorize the Bureau of Aeronautics to amend a grant to the Town of Whitefield (originally approved by G&C on 10-20-10, item #106), to conduct an environmental assessment for the Mt. Washington Region
approved
26A
Authorize the Bureau of Traffic to enter into a sole source memorandum of agreement with Iowa Department of Transportation, Ames, IA, to provide the State’s share of the operational costs totaling $14
$143,427 approved
26A
Authorize the Bureau of Traffic to enter into a sole source memorandum of agreement with Iowa Department of Transportation, Ames, IA, to provide the State’s share of the operational costs totaling $14
$143,427 approved
26A
Authorize the Bureau of Traffic to enter into a sole source memorandum of agreement with Iowa Department of Transportation, Ames, IA, to provide the State’s share of the operational costs totaling $14
$143,427 approved
26A
Authorize the Bureau of Traffic to enter into a sole source memorandum of agreement with Iowa Department of Transportation, Ames, IA, to provide the State’s share of the operational costs totaling $14
$143,427 approved
26A
Authorize the Bureau of Traffic to enter into a sole source memorandum of agreement with Iowa Department of Transportation, Ames, IA, to provide the State’s share of the operational costs totaling $14
$143,427 approved
26C
Authorize the Bureau of Construction to enter into a contract with F. L. Merrill Construction Inc., Loudon, NH, for roadway improvements on 1.7 miles of NH Route 108 in Durham and Newmarket, on the ba
$4.1M approved
26C
Authorize the Bureau of Construction to enter into a contract with F. L. Merrill Construction Inc., Loudon, NH, for roadway improvements on 1.7 miles of NH Route 108 in Durham and Newmarket, on the ba
$4.1M approved
26C
Authorize the Bureau of Construction to enter into a contract with F. L. Merrill Construction Inc., Loudon, NH, for roadway improvements on 1.7 miles of NH Route 108 in Durham and Newmarket, on the ba
$4.1M approved
26C
Authorize the Bureau of Construction to enter into a contract with F. L. Merrill Construction Inc., Loudon, NH, for roadway improvements on 1.7 miles of NH Route 108 in Durham and Newmarket, on the ba
$4.1M approved
26C
Authorize the Bureau of Construction to enter into a contract with F. L. Merrill Construction Inc., Loudon, NH, for roadway improvements on 1.7 miles of NH Route 108 in Durham and Newmarket, on the ba
$4.1M approved
26D
Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for minor expansion and reconfiguration of the Portsmouth Transportation Center, the Park an
$686,674 approved
26D
Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for minor expansion and reconfiguration of the Portsmouth Transportation Center, the Park an
$686,674 approved
26D
Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for minor expansion and reconfiguration of the Portsmouth Transportation Center, the Park an
$686,674 approved
26D
Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for minor expansion and reconfiguration of the Portsmouth Transportation Center, the Park an
$686,674 approved
26D
Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for minor expansion and reconfiguration of the Portsmouth Transportation Center, the Park an
$686,674 approved

Documents (5)

Item_26.pdf Open in new tab →
Item_26A.pdf (26A) Open in new tab →
Item_26B.pdf (26B) Open in new tab →
Item_26C.pdf (26C) Open in new tab →
Item_26D.pdf (26D) Open in new tab →
← Back to Aug 5, 2014 meeting