Authorize to amend a contract with GEI Consultants, Portland, ME, (originally approved by G&C on 11-14-12, item #114), to provide hydrologic and hydraulic studies of the Alton Power Dam and Milton Three Ponds Dame watersheds, inundation mapping of the downstream reach resulting from dam failure, geotechnical investigations, an engineering analysis of overtopping considerations and protection design/construction recommendations, by extending the completion date from December 31, 2013 to December 31, 2014. No Additional Funding.
Department
DEPARTMENT OF ENVIRONMENTAL SERVICES
Effective Dates
December 31, 2013 — December 31, 2014