Item 121
approved consent calendarNov 6, 2013
Description
Authorize the Bureau of Bridge Design to enter into an Interstate Bridge Agreement with the State of VT to allow the Department to bill VT for costs associated with the replacement of the bridge carrying US Route 2 over the Connecticut River between Lancaster, NH, and Guildhall, VT. Effective upon G&C approval and continuing through engineering design, construction, inspection, and final acceptance of the completed project. 80% NH, 20% VT Funds.
Vote Record
approved
Motion by Sununu, seconded by Pappas
Raymond Burton
(R)
yes
Colin Van Ostern
(D)
yes
Christopher Sununu
(R)
yes
Christopher Pappas
(D)
yes
Debora Pignatelli
(D)
yes
Documents (3)
Item_121.pdf
Open in new tab →
Item_121.pdf
Open in new tab →
Item_121.pdf
Open in new tab →