Meetings / Nov 6, 2013 / Item 122

Item 122

tabled consent calendar

Nov 6, 2013

Description

Authorize the Bureau of Bridge Design to enter into an agreement with Vanasse Hangen Brustlin Inc., for the In-depth Structural Inspection and Bridge Load Rating of the General Sullivan Bridge carrying pedestrian and recreational traffic over Little Bay between the city of Dover and the Town of Newington, for a total not to exceed $819,724.54. Effective upon G&C approval through August 31, 2016. 100% Turnpike Funds.

Amount
$819,725
$819,724.54
Funding Source
100% Turnpike Funds
Vote Record tabled
Motion by Van Ostern, seconded by Pignatelli voted to table the request of the Bureau of Bridge Design to enter into an agreement with Vanasse Hangen Brustlin Inc
Raymond Burton (R) yes
Colin Van Ostern (D) yes
Christopher Sununu (R) yes
Christopher Pappas (D) yes
Debora Pignatelli (D) yes

Documents (3)

Item_122.pdf Open in new tab →
Item_122.pdf Open in new tab →
Item_122.pdf Open in new tab →
← Back to Nov 6, 2013 meeting