Item 122
tabled consent calendarNov 6, 2013
Description
Authorize the Bureau of Bridge Design to enter into an agreement with Vanasse Hangen Brustlin Inc., for the In-depth Structural Inspection and Bridge Load Rating of the General Sullivan Bridge carrying pedestrian and recreational traffic over Little Bay between the city of Dover and the Town of Newington, for a total not to exceed $819,724.54. Effective upon G&C approval through August 31, 2016. 100% Turnpike Funds.
Amount
$819,725
$819,724.54
Department
DEPARTMENT OF TRANSPORTATION
Funding Source
100% Turnpike Funds
Vote Record
tabled
Motion by Van Ostern, seconded by Pignatelli voted to table the request of the Bureau of Bridge Design to enter into an agreement with Vanasse Hangen Brustlin Inc
Raymond Burton
(R)
yes
Colin Van Ostern
(D)
yes
Christopher Sununu
(R)
yes
Christopher Pappas
(D)
yes
Debora Pignatelli
(D)
yes
Documents (3)
Item_122.pdf
Open in new tab →
Item_122.pdf
Open in new tab →
Item_122.pdf
Open in new tab →