Meetings / Jul 27, 2022 / Item 23

Item 23

approved contract

Jul 27, 2022

Description

Authorize the Bureau of Construction to enter into a contract with R.M. Piper, Inc., Plymouth, NH, on the basis of a low bid of $939,542.50 for the removal of the toll plazas along Exit 10 NB off and SB on ramps at the Industrial Drive interchange on the F.E. Everett Turnpike. Effective upon G&C approval through November 18, 2022. 100% Turnpike Funds.

Amount
$939,542
$939,542.50
Vendor
R.M. Piper, Inc.
Plymouth, NH
Funding Source
100% Turnpike Funds
Vote Record approved
Motion by Kenney, seconded by Warmington acted as follows
Joseph Kenney (R) yes
Cinde Warmington (D) yes
Janet Stevens (R) yes
Ted Gatsas (R) yes
Dave Wheeler (R) yes

Documents (1)

Item_23.pdf Open in new tab →
← Back to Jul 27, 2022 meeting