Item 13A
approvedJan 7, 2026
Description
Authorize the Bureau of Right-of-Way to enter into an agreement with Vanesse Hangen Brustlin, Inc., Bedford, NH, for an amount not to exceed $750,000, for Statewide on-call professional survey services for various transportation projects located throughout the State. Effective upon G&C approval through January 31, 2031.
Vote Record
approved
Motion by Stevens, seconded by Kenney acted as follows
Joseph Kenney
(R)
yes
Karen Liot Hill
(D)
yes
Janet Stevens
(R)
yes
John Stephen
(R)
yes
Dave Wheeler
(R)
yes
Related Sub-Items (6)
13
Authorize the Bureau of Construction to enter into a contract with New England Infrastructure, Inc., Hudson, MA, on the basis of a low bid of $2,880,455 for preservation efforts on a 3-span bridge car
$2.9M
approved
13
Authorize the Bureau of Construction to enter into a contract with New England Infrastructure, Inc., Hudson, MA, on the basis of a low bid of $2,880,455 for preservation efforts on a 3-span bridge car
$2.9M
approved
13
Authorize the Bureau of Construction to enter into a contract with New England Infrastructure, Inc., Hudson, MA, on the basis of a low bid of $2,880,455 for preservation efforts on a 3-span bridge car
$2.9M
approved
13B
Authorize the Bureau of Right-of-Way to pay property owners $50,677.86 as documented in the Contemplated Awards List, for amounts exceeding $5,000 for the period from November 19, 2025 through Decembe
$50,678
approved
13B
Authorize the Bureau of Right-of-Way to pay property owners $50,677.86 as documented in the Contemplated Awards List, for amounts exceeding $5,000 for the period from November 19, 2025 through Decembe
$50,678
approved
13B
Authorize the Bureau of Right-of-Way to pay property owners $50,677.86 as documented in the Contemplated Awards List, for amounts exceeding $5,000 for the period from November 19, 2025 through Decembe
$50,678
approved
Documents (3)
Item_13.pdf
Open in new tab →
Item_13A.pdf
(13A)
Open in new tab →
Item_13B.pdf
(13B)
Open in new tab →