Meetings / May 15, 2024 / Item 51

Item 51

approved contract

May 15, 2024

Description

Authorize the Bureau of Bridge Design to amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 12/22/21), for the replacement of the existing Red List bridge carrying NH Route 1A over Hampton River in the Town of Hampton, NH, by extending the completion date from June 30, 2024 to December 31, 2028. (2) Further authorize to increase the fee by $973,612.31 from $1,991,660.55 to $2,965,272.86. Effective upon G&C approval. 100% Federal Funds

Amount
$3.0M
$973,612.31, $1,991,660.55, $2,965,272.86
Vendor
HDR Engineering, Inc.
Manchester, NH
Funding Source
100% Federal Funds
Effective Dates
June 30, 2024 — December 31, 2028
Vote Record approved
Motion by Gatsas, seconded by Kenney acted as follows
Joseph Kenney (R) yes
Cinde Warmington (D) yes
Janet Stevens (R) yes
Ted Gatsas (R) yes
Dave Wheeler (R) yes

Documents (1)

Item_51.pdf Open in new tab →
← Back to May 15, 2024 meeting