Item 40
approved contractMay 1, 2024
Description
Authorize the Bureau of Highway Design to retroactively amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 7/15/20), for preliminary design of improvements to NH Route 1A (Ocean Boulevard) in the Town of Hampton, NH, by extending the completion date from March 31, 2024 to March 31, 2025. Effective upon G&C approval. Time extension only, no additional funding.
Vote Record
approved
Motion by Kenney, seconded by Wheeler acted as follows
Joseph Kenney
(R)
yes
Cinde Warmington
(D)
yes
Janet Stevens
(R)
yes
Ted Gatsas
(R)
yes
Dave Wheeler
(R)
yes
Documents (1)
Item_40.pdf
Open in new tab →