Meetings / May 1, 2024 / Item 40

Item 40

approved contract

May 1, 2024

Description

Authorize the Bureau of Highway Design to retroactively amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 7/15/20), for preliminary design of improvements to NH Route 1A (Ocean Boulevard) in the Town of Hampton, NH, by extending the completion date from March 31, 2024 to March 31, 2025. Effective upon G&C approval. Time extension only, no additional funding.

Vendor
HDR Engineering, Inc.
Manchester, NH
Effective Dates
March 31, 2024 — March 31, 2025
Vote Record approved
Motion by Kenney, seconded by Wheeler acted as follows
Joseph Kenney (R) yes
Cinde Warmington (D) yes
Janet Stevens (R) yes
Ted Gatsas (R) yes
Dave Wheeler (R) yes

Documents (1)

Item_40.pdf Open in new tab →
← Back to May 1, 2024 meeting