Meetings / Oct 4, 2023 / Item 28

Item 28

approved amendment

Oct 4, 2023

Description

Authorize the Bureau of Highway Design to amend a Memorandum of Agreement with the Pease Development Authority – Division of Ports and Harbors (originally approved by G&C on 3/7/18, Item #26) relative to a Memorandum of Agreement for the final design and construction of the Functional Replacement of the Side Barge Whaft impacted by the replacement of the Sarah Mildred Long Bridge carrying the US Route 1 Bypass over the Piscataqua River between Portsmouth, NH and Kittery, ME. (2) Further authorize to increase the price limitation by $26,145,458 from $18,550,000 to $44,695,458. Effective upon G&C approval and continuing through design, construction, inspection, and final acceptance of the completed project. 99.98% Federal Funds, 0.02% State Funds

Vote Record approved
Motion by Kenney, seconded by Stevens acted as follows
Joseph Kenney (R) yes
Cinde Warmington (D) yes
Janet Stevens (R) yes
Ted Gatsas (R) yes
Dave Wheeler (R) yes

Documents (1)

Item_28.pdf Open in new tab →
← Back to Oct 4, 2023 meeting