Meetings / Jul 19, 2023 / Item 31

Item 31

approved contract

Jul 19, 2023

Description

Authorize the Bureau of Bridge Maintenance to enter into a contract based on a single hourly rate bid with Northeast Integration, LLC, North Hampton, NH, in the amount of $75,000, to provide all labor, materials, equipment and transportation necessary to perform programmable logic controller services, for the State of NH DOT for work that includes maintenance, repairs, and system upgrades to electrical systems for the Sarah Mildred Long Bridge, the Memorial Bridge, Hampton River Bridge, Piscataqua River Bridge and Various Bridges statewide. Effective upon G&C approval through June 30, 2026. 68% Highway Funds, 32% Other Funds

Amount
$75,000
$75,000,
Funding Source
68% Highway Funds; 32% Other Funds
Vote Record approved
Motion by Kenney, seconded by Stevens acted as follows
Joseph Kenney (R) yes
Cinde Warmington (D) yes
Janet Stevens (R) yes
Ted Gatsas (R) yes
Dave Wheeler (R) yes
Related Sub-Items (2)

Documents (2)

Item_31.pdf Open in new tab →
Item_31A.pdf (31A) Open in new tab →
← Back to Jul 19, 2023 meeting