Meetings / Jun 14, 2023 / Item 52

Item 52

approved contract late item

Jun 14, 2023

Description

Authorize the Bureau of Bridge Design to amend an existing contract with Vanasse Hangen Brustlin, Inc., Bedford, NH (originally approved by G&C on 6/30/21), for General Sullivan Bridge superstructure replacement between the Town of Newington and the City of Dover, by increasing the total fee by $110,059.73 from $1,775,470 to $1,885,529.73. Effective upon G&C approval. No additional time is required. 100% Turnpike Funds

Amount
$1.9M
$110,059.73, $1,775,470, $1,885,529.73
Vendor
Vanasse Hangen Brustlin, Inc.
Bedford, NH
Funding Source
100% Turnpike Funds
Vote Record approved
Motion by Stevens, seconded by Warmington acted as
Joseph Kenney (R) yes
Cinde Warmington (D) yes
Janet Stevens (R) yes
Ted Gatsas (R) yes
Dave Wheeler (R) yes

Documents (1)

Item_52.pdf Open in new tab →
← Back to Jun 14, 2023 meeting