Item 18
approvedOct 7, 2020
Description
Authorize the Bureau of Bridge Design to enter into an Interstate Bridge Agreement with the State of Vermont to allow the Department to bill Vermont for costs associated with bridge rehabilitation efforts on the bridge (NH Br. No. 109/134) carrying NH Route 18 over the Connecticut River between Littleton NH and Waterford, VT. Effective upon G&C approval and continuing through engineering design, construction, inspection, and final acceptance of the completed project, in accordance with the Department’s 10-Year Transportation Improvement Plan. (Project costs will be shared 67% NH, 33% VT).
Department
DEPARTMENT OF TRANSPORTATION
Vendor
State of Vermont to allow the Department to bill Vermont for costs associated with bridge rehabilitation efforts on the bridge (NH Br. No. 109/134) carrying NH Route 18 over the Connecticut River between Littleton NH and Waterford, VT. Effective upon G&C approval and continuing through engineering design, construction, inspection
and final acceptance of the completed project, in
Funding Source
67% NH; 33% VT)
Vote Record
approved
Michael Cryans
(D)
yes
Andru Volinsky
(D)
yes
Russell Prescott
(R)
yes
Ted Gatsas
(R)
yes
Debora Pignatelli
(D)
yes
Documents (1)
Item_18.pdf
Open in new tab →