Meetings / Jul 15, 2020 / Item 24

Item 24

approved contract

Jul 15, 2020

Description

Authorize the Bureau of Bridge Design to retroactively amend a contract with HDR Engineering Inc., Manchester, NH (originally approved by G&C on 12-21-16, item #33), for the final design for the replacement of the Red List bridge carrying NH Route 1B over Little Harbor between the Towns of New Castle and Rye, by extending the completion date from June 30, 2020 to June 30, 2021. No Additional Funding.

Vendor
HDR Engineering Inc.
Manchester, NH
Effective Dates
June 30, 2020 — June 30, 2021
Vote Record approved
Motion by Volinsky, seconded by Prescott
Michael Cryans (D) yes
Andru Volinsky (D) yes
Russell Prescott (R) yes
Ted Gatsas (R) yes
Debora Pignatelli (D) yes

Documents (1)

Item_24.pdf Open in new tab →
← Back to Jul 15, 2020 meeting