← All Vendors

HDR Engineering Inc.

25 items $34.7M total value Bedford, NH 10/17/12 – 01/28/26
Item Types
Type Count Total Value
contract 16 $20.4M
other 9 $14.3M
Items
Date Item Department Description Type Amount Outcome
01/28/26 #21 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Asset Management, Performance, and Strategy to enter into an agreement with HDR Engineering, Inc., Bedford, NH, for an amount not to exceed $2,399,992.42 for services necessary $2.4M approved
07/30/25 #12 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Highway Design to retroactively amend a contract with HDR Engineering, Inc., Bedford, NH (originally approved by G&C on 7/15/20) for preliminary design of improvements to NH Ro contract $2.9M approved
03/12/25 #31 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Highway Design to retroactively amend the contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 9/26/20, Item #27), for preliminary design of impro contract approved
10/16/24 #G DEPARTMENT OF ENVIRONMENTAL SERVICES Authorize to amend an agreement with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 10/19/22, Item #74), by decreasing the contract by $2,000,000 from $4,000,000 to $2,000,000 fo contract $4.0M
06/26/24 #115 NEW HAMPSHIRE FISH AND GAME DEPARTMENT Authorize to enter into a sole source contract with HDR Engineering, Inc., Manchester, NH, in an amount up to $27,000, to perform technical support and expertise during the EPA NPDES Waste Water renew contract $27,000 approved
06/12/24 #S NEW HAMPSHIRE FISH AND GAME DEPARTMENT Authorize to amend an existing contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 11/22/22, Item #81), for the Powder Mill Fish Hatchery Downstream Phosphorus Study by contract $199,980
05/15/24 #44 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Highway Design to enter into an agreement with HDR Engineering, Inc., Manchester, NH, for an amount not to exceed $1,491,959.78, for professional engineering and environmental $1.5M approved
05/15/24 #51 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Bridge Design to amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 12/22/21), for the replacement of the existing Red List bridge carry contract $3.0M approved
05/01/24 #40 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Highway Design to retroactively amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 7/15/20), for preliminary design of improvements to N contract approved
12/20/23 #C DEPARTMENT OF TRANSPORTATION Authorize to amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 8/26/20, Item #27), for preliminary design of improvements to NH Route 120 in Lebanon, NH by ext contract
11/29/23 #107 DEPARTMENT OF ADMINISTRATIVE SERVICES Authorize the Division of Public Works Design and Construction to enter into a contract with HDR Engineering, Inc., Manchester, NH, for a total price not to exceed $6,733,000 for Hatchery Modernizatio contract $7.3M approved
10/04/23 #49 NEW HAMPSHIRE FISH AND GAME DEPARTMENT Authorize to enter into a sole source retroactive amendment to an existing contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 11/22/21, Item #66), to conduct a Fish Hat contract $985,225 approved
02/22/23 #E DEPARTMENT OF TRANSPORTATION Authorize to amend an existing contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 7/15/20, Item #Late A), for preliminary design of improvements to NH Route 1A (Ocean B contract
11/22/22 #81 NEW HAMPSHIRE FISH AND GAME DEPARTMENT Authorize to enter into a contract with HDR Engineering, Inc., Manchester, NH, in the amount of $199,980 to conduct the Powder Mill Fish Hatchery (PMFH) Downstream Phosphorus Study. Effective upon G&C contract $199,980 approved
10/19/22 #74 DEPARTMENT OF ENVIRONMENTAL SERVICES Authorize to enter into an agreement with HDR Engineering, Inc., Manchester, NH in an amount not to exceed $4,000,000 to provide as needed engineering and technical support services for repair/reconst $4.0M approved
06/29/22 #H Authorize the Bureau of Bridge Design to amend a contract with HDR Engineering, Inc., Manchester, NH, (originally approved by G&C on 12/21/16, item #33), for the final design for the replacement of th contract
11/22/21 #66 NEW HAMPSHIRE FISH AND GAME DEPARTMENT Authorize to enter into a contract with HDR Engineering Inc., Manchester, NH, to conduct the Powder Mill Fish Hatchery Feasibility Study, in the amount of $940,053. Effective upon G&C approval through contract $940,053 approved
06/16/21 #47 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Omaha, NE, for on-call engineering services for various bridge projects located throughout the State, for an $1.0M approved
08/26/20 #27 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Highway Design to enter into an agreement with HDR Engineering Inc., Manchester, NH, for preliminary design of improvements to NH Route 120 in the City of Lebanon, for an amoun $1.2M approved
07/15/20 #24 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Bridge Design to retroactively amend a contract with HDR Engineering Inc., Manchester, NH (originally approved by G&C on 12-21-16, item #33), for the final design for the repla contract approved
01/09/19 #20 DEPARTMENT OF TRANSPORTATION Authorize Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Concord, NH, for on-call engineering services for various bridge projects located throughout the State, for a to $1.0M approved
05/02/18 #36 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Manchester, NH, for preliminary design for the rehabilitation or replacement of the redlisted bridge (Br. No $1.9M approved
02/01/17 #24 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Manchester, NH, for on-call engineering services for various bridge projects located throughout the State, f $750,000 approved
06/05/13 #230 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Rail & Transit to enter into an agreement with HDR Engineering Inc., Boston, MA, to evaluate the potential development of an extension of commuter rail service operated by the $658,316 approved
10/17/12 #89 DEPARTMENT OF TRANSPORTATION Authorize the Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Boston, MA, for the preliminary design for the rehabilitation or replacement of the Red List bridge carrying contract $932,762 approved