Meetings / Jun 20, 2018 / Item 60B

Item 60B

approved contract

Jun 20, 2018

Description

Authorize the Bureau of Right of Way to enter into a contract with Innovision Realty Group LLC, Goffstown, NH, for the management of properties throughout the State, in the amount of $478,776.32. (2)Further authorize to provide funds through rents collected to Innovision Realty Group in the amount of $125,000 to fund the maintenance and management checking accounts used in the management of properties located in Regions 1, 2, and 3. Effective July 1, 2018 through June 30, 2022.

Amount
$478,776
$478,776.32, $125,000
Vendor
Innovision Realty Group LLC
Goffstown, NH
Vote Record approved
Motion by Kenney, seconded by Wheeler voted to table
Joseph Kenney (R) yes
Andru Volinsky (D) yes
Russell Prescott (R) yes
Christopher Pappas (D) yes
Dave Wheeler (R) yes
Related Sub-Items (12)
60
Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with R&R Communication Inc., Swanzey, NH, for the purpose of providing statewide service and repairs t
$178,625 approved
60
Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with R&R Communication Inc., Swanzey, NH, for the purpose of providing statewide service and repairs t
$178,625 approved
60
Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with R&R Communication Inc., Swanzey, NH, for the purpose of providing statewide service and repairs t
$178,625 approved
60
Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with R&R Communication Inc., Swanzey, NH, for the purpose of providing statewide service and repairs t
$178,625 approved
60A
Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for preliminary and final design to incorporate the fourth travel lane in each directi
$3.0M approved
60A
Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for preliminary and final design to incorporate the fourth travel lane in each directi
$3.0M approved
60A
Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for preliminary and final design to incorporate the fourth travel lane in each directi
$3.0M approved
60A
Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for preliminary and final design to incorporate the fourth travel lane in each directi
$3.0M approved
60C
Authorize the Bureau of Construction to enter into a contract with Evroks Corporation Inc., Northfield, NH, for furnishing and installing debris shielding and or debris netting on 15 bridges statewide
$1.6M approved
60C
Authorize the Bureau of Construction to enter into a contract with Evroks Corporation Inc., Northfield, NH, for furnishing and installing debris shielding and or debris netting on 15 bridges statewide
$1.6M approved
60C
Authorize the Bureau of Construction to enter into a contract with Evroks Corporation Inc., Northfield, NH, for furnishing and installing debris shielding and or debris netting on 15 bridges statewide
$1.6M approved
60C
Authorize the Bureau of Construction to enter into a contract with Evroks Corporation Inc., Northfield, NH, for furnishing and installing debris shielding and or debris netting on 15 bridges statewide
$1.6M approved

Documents (4)

Item_60.pdf Open in new tab →
Item_60A.pdf (60A) Open in new tab →
Item_60B.pdf (60B) Open in new tab →
Item_60C.pdf (60C) Open in new tab →
← Back to Jun 20, 2018 meeting