Meetings / Jun 20, 2018 / Item 60C

Item 60C

approved contract

Jun 20, 2018

Description

Authorize the Bureau of Construction to enter into a contract with Evroks Corporation Inc., Northfield, NH, for furnishing and installing debris shielding and or debris netting on 15 bridges statewide, on the basis of a low bid of $1,628,098.45. (2)Further authorize a contingency in the amount of $81,404.92 for payment of latent conditions, which may appear during the construction of the project. Effective upon G&C approval through May 17, 2019. 91% Federal, 9% Turnpike Funds.

Amount
$1.6M
$1,628,098.45, $81,404.92
Vendor
Evroks Corporation Inc.
Northfield, NH
Funding Source
91% Federal; 9% Turnpike Funds
Vote Record approved
Motion by Kenney, seconded by Wheeler voted to table
Joseph Kenney (R) yes
Andru Volinsky (D) yes
Russell Prescott (R) yes
Christopher Pappas (D) yes
Dave Wheeler (R) yes
Related Sub-Items (12)
60
Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with R&R Communication Inc., Swanzey, NH, for the purpose of providing statewide service and repairs t
$178,625 approved
60
Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with R&R Communication Inc., Swanzey, NH, for the purpose of providing statewide service and repairs t
$178,625 approved
60
Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with R&R Communication Inc., Swanzey, NH, for the purpose of providing statewide service and repairs t
$178,625 approved
60
Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with R&R Communication Inc., Swanzey, NH, for the purpose of providing statewide service and repairs t
$178,625 approved
60A
Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for preliminary and final design to incorporate the fourth travel lane in each directi
$3.0M approved
60A
Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for preliminary and final design to incorporate the fourth travel lane in each directi
$3.0M approved
60A
Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for preliminary and final design to incorporate the fourth travel lane in each directi
$3.0M approved
60A
Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for preliminary and final design to incorporate the fourth travel lane in each directi
$3.0M approved
60B
Authorize the Bureau of Right of Way to enter into a contract with Innovision Realty Group LLC, Goffstown, NH, for the management of properties throughout the State, in the amount of $478,776.32. (2)F
$478,776 approved
60B
Authorize the Bureau of Right of Way to enter into a contract with Innovision Realty Group LLC, Goffstown, NH, for the management of properties throughout the State, in the amount of $478,776.32. (2)F
$478,776 approved
60B
Authorize the Bureau of Right of Way to enter into a contract with Innovision Realty Group LLC, Goffstown, NH, for the management of properties throughout the State, in the amount of $478,776.32. (2)F
$478,776 approved
60B
Authorize the Bureau of Right of Way to enter into a contract with Innovision Realty Group LLC, Goffstown, NH, for the management of properties throughout the State, in the amount of $478,776.32. (2)F
$478,776 approved

Documents (4)

Item_60.pdf Open in new tab →
Item_60A.pdf (60A) Open in new tab →
Item_60B.pdf (60B) Open in new tab →
Item_60C.pdf (60C) Open in new tab →
← Back to Jun 20, 2018 meeting