Meetings / May 2, 2018 / Item 36

Item 36

approved

May 2, 2018

Description

Authorize the Bureau of Bridge Design to enter into an agreement with HDR Engineering Inc., Manchester, NH, for preliminary design for the rehabilitation or replacement of the redlisted bridge (Br. No. 235/025) carrying NH Route 1A over Hampton River in the Town of Hampton, for an amount not to exceed $1,896,169.39. Effective upon G&C approval through June 30, 2021. 100% Federal Funds.

Amount
$1.9M
$1,896,169.39
Vendor
HDR Engineering Inc.
Manchester, NH
Funding Source
100% Federal Funds
Vote Record approved
Motion by Volinsky, seconded by Prescott acted as follows
Joseph Kenney (R) yes
Andru Volinsky (D) yes
Russell Prescott (R) yes
Christopher Pappas (D) yes
Dave Wheeler (R) yes

Documents (1)

Item_36.pdf Open in new tab →
← Back to May 2, 2018 meeting