Item 95
approved contract late itemFeb 16, 2022
Description
Authorize to enter into a contract with HDR Engineering Inc., Manchester, NH, to perform an engineering evaluation and design the repairs or replacement of the three existing flood gates at Lakeport Dam in Laconia, in an amount not to exceed $122,399. Effective upon G&C approval through October 31, 2022. 100% Capital (General) Funds.
Amount
$122,399
$122,399
Funding Source
100% Capital (General) Funds
Vote Record
approved
Joseph Kenney
(R)
yes
Cinde Warmington
(D)
yes
Janet Stevens
(R)
yes
Ted Gatsas
(R)
yes
Dave Wheeler
(R)
yes
Documents (1)
Item_95.pdf
Open in new tab →