Meetings / Sep 21, 2022 / Item 37A

Item 37A

approved contract

Sep 21, 2022

Description

Authorize to amend a contract with HDR Engineering, Inc., Manchester, NH and Omaha, NB (originally approved by G&C on 8-26-20, item #27), for preliminary design of improvements to NH Route 120 in the City of Lebanon, by retroactively extending the completion date from August 31, 2022 to December 31, 2023. Effective upon G&C approval. Time extension only, no new funding.

Vendor
HDR Engineering, Inc.
Manchester, NH
Effective Dates
August 31, 2022 — December 31, 2023
Vote Record approved
Motion by Kenney, seconded by Warmington acted as follows
Joseph Kenney (R) yes
Cinde Warmington (D) yes
Janet Stevens (R) yes
Ted Gatsas (R) yes
Dave Wheeler (R) yes
Related Sub-Items (1)

Documents (2)

Item_37.pdf Open in new tab →
Item_37A.pdf (37A) Open in new tab →
← Back to Sep 21, 2022 meeting