Meetings / Feb 22, 2023 / Item E

Item E

contract consent calendar

Feb 22, 2023

Description

Authorize to amend an existing contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 7/15/20, Item #Late A), for preliminary design of improvements to NH Route 1A (Ocean Boulevard) in the Town of Hampton, by extending the completion date from March 31, 2023 to March 31, 2024. Effective upon G&C approval. Time extension only, no additional funding.

Vendor
HDR Engineering, Inc.
Manchester, NH
Effective Dates
March 31, 2023 — March 31, 2024
Related Sub-Items (5)
← Back to Feb 22, 2023 meeting