Top Vendors
| Vendor | Items | Total |
|---|---|---|
| Pike Industries Inc. | 117 | $502.2M |
| R.S. Audley Inc. | 30 | $429.4M |
| Continental Paving Inc. | 83 | $373.5M |
| Cubic Transportation Systems Inc. | 3 | $337.0M |
| State of Maine | 4 | $213.0M |
| state of Maine | 1 | $176.7M |
| Xerox State and Local Solution | 2 | $140.2M |
| SPS New England Inc. | 3 | $115.1M |
| Alvin J. Coleman & Son Inc. | 19 | $107.8M |
| Weaver Brothers Construction Company Inc. | 5 | $96.5M |
| Brox Industries Inc. | 23 | $89.1M |
| Archer Western Contractors LLC | 1 | $83.9M |
| Reed & Reed General Contractors | 2 | $78.2M |
| Severino Trucking Co Inc. | 1 | $67.1M |
| E.D. Swett Inc. | 12 | $67.1M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 1,572 | $4.21B |
| other | 1,466 | $3.45B |
| grant | 215 | $290.6M |
| transfer | 173 | $311.3M |
| nomination | 117 | $109.2M |
| amendment | 107 | $331.5M |
| lease | 102 | $25.2M |
| payment | 39 | $1.4M |
| permit | 38 | $10.7M |
| personnel | 15 | $100.3M |
| report | 12 | $5.7M |
| settlement | 4 | $5.0M |
| expenditure | 2 | $46,329 |
| waiver | 1 | $250,000 |
Spending by Year
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 01/22/21 | #45 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for pavement resurfacing in three towns in District 1, on the basis of a low bid of $1,068,630.85. | Pike Industries Inc. | $1.1M | approved |
| 01/22/21 | #46 | Authorize the Bureau of Right of Way to sell 2,375 SF of State owned land on the westerly side of Range Road, formerly NH Route 111A in the Town of Windham. The sale would be directly to the abutter K | $17,600 | approved | |
| 01/22/21 | #47 | Authorize the Bureau of Right of Way to sell 0.06 +/- of an acre of State-owned land on the northeasterly side of Acorn Lane at the corner of Woodbury Ave in the Town of Pelham. The sale would be dire | $2,600 | approved | |
| 01/22/21 | #48 | Authorize the Bureau of Construction to enter into a contract with Winterset Inc., Lyndonville, VT, for slope failure repair and minor road changes, on the basis of a low bid of $373,044.50. (2)Furthe | Winterset Inc. | $373,044 | approved |
| 01/22/21 | #49 | Authorize the Bureau of Construction to enter into a contract with J. Hutchins Inc., Richmond, VT, for roadway resurfacing in 2 towns in District 1, on the basis of a low bid of $1,877,388.94. (2)Furt | J. Hutchins Inc. | $1.9M | approved |
| 01/22/21 | #50 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for pavement resurfacing along the Central Turnpike system, on the basis of a low bid of $8 | Continental Paving Inc. | $8.3M | approved |
| 01/22/21 | #51 | Authorize the Bureau of Construction to enter into a contract with Brox Industries Inc., Dracut, MA, for pavement resurfacing along the Eastern Turnpike system, on the basis of a low bid of $8,639,611 | Brox Industries Inc. | $8.6M | approved |
| 01/22/21 | #52 | Authorize the Bureau of Turnpikes to exercise contract renewal options with Citizens Bank National Association, Manchester, NH (originally approved by G&C on 1-27-16, item #25), for the second of two | $3.7M | approved | |
| 01/22/21 | #53 | Authorize the Bureau of Highway Design to enter into an agreement with Fuss & O’Neill Inc., Manchester, NH, for on-call engineering services for various transportation projects located throughout the | Fuss & O’Neill Inc. | $1.0M | approved |
| 01/22/21 | #54 | Authorize the Bureau of Highway Design to enter into an agreement with Greenman-Pedersen Inc., Bedford, NH, for on-call engineering services for various transportation projects located throughout the | Greenman-Pedersen Inc. | $1.0M | approved |
| 01/22/21 | #55 | Authorize the Bureau of Highway Design to enter into an agreement with McFarland-Johnson Inc., Concord, NH, for on-call engineering services for various transportation projects located throughout the | McFarland-Johnson Inc. | $1.0M | approved |
| 01/22/21 | #56 | Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for on-call engineering services for various transportation projects located throughou | Vanasse Hangen Brustlin Inc. | $1.0M | approved |
| 01/22/21 | #57 | Authorize the Bureau of Highway Design to retroactively amend a contract with McFarland-Johnson Inc., Concord NH and Binghamton, NY, to prepare the second phase of the preliminary engineering design f | McFarland-Johnson Inc. | $2.5M | approved |
| 01/22/21 | #58 | Authorize the Bureau of Rail & Transit to enter into an Operating Agreement with the New England Central Railroad Inc., Rochester, NY for the use of the state-owned Northern Railroad Line in Lebanon, | New England Central Railroad I | approved | |
| 12/18/20 | #6 | NOT USED | not_used | ||
| 12/18/20 | #16 | Authorize the Bureau of Right of Way to pay property owners $356,619.80 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from October 24, 2020 thr | $356,620 | approved | |
| 12/18/20 | #17 | Authorize the Bureau of Construction to make three stipend payments totaling $375,000 to three design/build teams at $125,000 each; Middlesex Corporation, R.S. Audley & SPS New England, on the Derry-L | $375,000 | approved | |
| 12/18/20 | #18 | Authorize the Bureau of Right of Way to sell a 0.21+/- acre parcel and a 0.28+/- acre parcel of vacant lands located at 52 and 54 Baldwin Street, respectively, in the City of Nashua. The sale would be | $220,000 | approved | |
| 12/18/20 | #19 | Authorize the Bureau of Right of Way to pay property owners $25,012.80 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from November 10, 2020 thr | $25,013 | approved | |
| 12/18/20 | #20 | Authorize the Bureau of Rail & Transit to enter into an agreement with AECOM Technical Services Inc., Manchester, NH, for preliminary engineering, environmental services, financial plan development, p | AECOM Technical Services Inc. | $5.4M | approved |
| 12/18/20 | #21 | Authorize to accept and place on file the Bureau of Right of Way’s Informational Report of the steps taken to formally dissolve the layout of the Conway Bypass Project #11399. | approved | ||
| 12/18/20 | #21A | Authorize the Bureau of Bridge Design to amend a contract with HNTB Corporation, Kansas City, MO (originally approved by G&C on 5-15-19, item #29), for construction support services in support of pres | HNTB Corporation | $378,083 | approved |
| 12/18/20 | #21B | Authorize the Bureau of Construction to enter into a contract with R.S. Audley Inc., Bow, NH, for maintenance and preservation work on five bridges on I-93 in Manchester and Hooksett, on the basis of | R.S. Audley Inc. | $8.4M | approved |
| 12/02/20 | #24 | Authorize the Bureau of Right of Way to sell a 2 +/- acre parcel of State-owned land located at 15 Riverview Drive in the City of Franklin, to the abutter, Chris Dumont Trust & Georgette Dumont Trust | $46,000 | approved | |
| 12/02/20 | #25 | Authorize the Bureau of Construction to enter into a contract with S.U.R Construction Inc., Rochester, NH, for the signalization of the intersection of the US 4 westbound ramps with NH 108 on the basi | S.U.R Construction Inc. | $763,421 | approved |
| 12/02/20 | #26 | Authorize the Bureau of Planning & Community Assistance to enter into an agreement totaling $1,828,000 with the Town of Sugar Hill, to provide funding and services under the Federal Municipal Off Syst | $1.8M | approved | |
| 12/02/20 | #27 | Authorize the Office of Federal Compliance to enter into a contract with RND Consultants Inc., Boston, MA, to provide business development training and resources to Disadvantaged Business Enterprise f | RND Consultants Inc. | $46,656 | approved |
| 12/02/20 | #28 | Authorize the Bureau of Construction to enter into a contract with Evroks Corporation, Northfield, NH, for bridge preservation work on two bridges on US 302 in Bethlehem and Carroll, on the basis of a | Evroks Corporation | $1.5M | approved |
| 12/02/20 | #29 | Authorize the Bureau of Construction to enter into a contract with Modern Protective Coatings Inc., Hudson, NH, for painting of six steel beam bridges on I-89 in Concord and Hopkinton, on the basis of | Modern Protective Coatings Inc | $1.4M | approved |
| 11/18/20 | #36 | Authorize the Bureau of Aeronautics to budget and expend prior year carry-forward funds in the amount of $237,729 to fund the Airport Improvement and Maintenance Program. Effective upon G&C approval t | $237,729 | approved | |
| 11/18/20 | #37 | Authorize the Bureau of Right of Way to pay property owners $274,210.40 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from September 25, 2020 t | $274,210 | approved | |
| 11/18/20 | #38 | Authorize the Bureau of Right of Way to sell a 2.85 +/- acre parcel of State-owned land on the southwesterly corner of NH Route 9 and Murdough Hill Road in the Town of Nelson to David and Heather Bowe | $3,100 | approved | |
| 11/18/20 | #39 | Authorize the Bureau of Planning and Community Assistance to enter the NH Department of Transportation and the NH Department of Natural and Cultural Resources into a memorandum of agreement for up to | $6.2M | approved | |
| 11/18/20 | #40 | Authorize to accept and place on file the Bureau of Highway Maintenance’s annual basis summary of contracts with various private contractors to assist with winter maintenance activities, emergency rep | approved | ||
| 11/18/20 | #41 | Authorize the Bureau of Rail & Transit to enter into a sole source agreement with Dartmouth Transportation Company Inc., Concord, NH, for expenses related to year-round maintenance of the I-89 Exit 12 | Dartmouth Transportation Compa | $9,500 | approved |
| 11/18/20 | #42 | Authorize the Bureau of Rail & Transit to enter into an agreement with Jalbert Leasing Inc., d/b/a C&J Bus Lines, Portsmouth, NH, for pavement improvements and associated ancillary items at the State- | Jalbert Leasing Inc., d/b/a C& | $76,000 | approved |
| 11/18/20 | #43 | Authorize the Bureau of Transportation Systems Management & Operations to enter into an agreement with DTN LLC, Omaha, NE, for the DTN Weather Forecast Services, based upon a single bid received in th | DTN LLC | $56,351 | approved |
| 11/18/20 | #44 | Authorize the Bureau of Transportation Systems Management & Operations to enter into a retroactive contract amendment with Southwest Research Institute, San Antonio, TX (originally approved by G&C on | approved | ||
| 11/18/20 | #45 | Authorize the Bureau of Construction to enter into a contract with L&D Safety Marking Corp., Barre, VT, for safety improvements within the I-93 corridor extending from the MA/NH State line in Salem to | L&D Safety Marking Corp. | $949,750 | approved |
| 11/18/20 | #46 | Authorize to accept and place on file the Bureau of Right of Way’s Contemplated Awards List for amounts less than $5,000 for the sum total of $37,149.57 for the period extending from July 1, 2020 thro | $37,150 | approved | |
| 10/21/20 | #16 | Authorize the Office of Federal Compliance to enter into a sole source contract with Hessel & Associates LLC, Brattleboro, VT, to provide employment outreach and placement services for minorities and | Hessel & Associates LLC | $24,551 | approved |
| 10/21/20 | #17 | Authorize the Bureau of Transportation Systems Management & Operations to enter into a memorandum of agreement for $500,000 to support the administration of the State of NH’s Highway Truck Weight Safe | $500,000 | approved | |
| 10/21/20 | #18 | Authorize the Bureau of Rail & Transit to amend a lease of 65,100 square foot parcel of state-owned land located on the Northern Railroad Corridor in the City of Lebanon to Superior Plus Energy Inc. ( | $5,875 | approved | |
| 10/21/20 | #19 | Authorize the Bureau of Construction to enter into a contract amendment with J.P. Sicard Inc., Barton, VT (originally approved by G&C on 6-10-20, item #30), for roadway slope repair on NH 16 in Errol, | $1.1M | approved | |
| 10/21/20 | #20 | Authorize the Bureau of Rail & Transit to accept and expend grant revenue in the amount of $2,572 from the Federal Railroad Administration program to cover eligible personnel to attend FRA training co | $2,572 | approved | |
| 10/21/20 | #21 | Authorize the Bureau of Right of Way to pay property owners $123,860.90 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from September 15, 2020 t | $123,861 | approved | |
| 10/21/20 | #22 | Authorize the Bureau of Right of Way to pay a property owner $5,608 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from September 5, 2020 throug | $5,608 | approved | |
| 10/21/20 | #23 | Authorize the Bureau of Construction to enter into a contract with Northeast Traffic Control Services, Plymouth, MA, for sign replacement on I-93 NB and SB mainline at Exits 25, 27 and 28, on the basi | Northeast Traffic Control Serv | $214,154 | approved |
| 10/21/20 | #24 | Authorize the Bureau of Turnpikes to enter into an agreement with Stantec Consulting Services Inc., Bedford, NH, for on-call Turnpike-related consulting services, for an amount not to exceed $600,000. | Stantec Consulting Services In | $600,000 | approved |
| 10/21/20 | #25 | Authorize the Bureau of Environment to enter into an agreement with Tighe & Bond Inc., Portsmouth, NH, for on-call environmental/wetlands-related services with a focus on coastal wetlands and resource | Tighe & Bond Inc. | $400,000 | approved |