← All Vendors
Northeast Traffic Control Services
5 items
$4.4M total value
Plymouth, MA
05/01/19 – 02/05/25
Top Departments
| Department | Items | Total |
|---|---|---|
| DEPARTMENT OF TRANSPORTATION | 5 | $4.4M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 5 | $4.4M |
Items
| Date | Item | Department | Description | Type | Amount | Outcome |
|---|---|---|---|---|---|---|
| 02/05/25 | #35 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Northeast Traffic Control Services, Plymouth, MA, on the basis of a low bid of $1,206,925 for Emergency Vehicle Load Posting Sign ins | contract | $1.2M | approved |
| 12/21/22 | #45 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Northeast Traffic Control Services, Plymouth, MA, on the basis of a low bid of $1,743,476.75, for removal and replacement of Enhanced | contract | $1.7M | approved |
| 12/07/22 | #27 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Northeast Traffic Control Services, Plymouth, MA, on the basis of a low bid of $477,790.53 for sign upgrade and replacement on I-393 | contract | $477,791 | approved |
| 10/21/20 | #23 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Northeast Traffic Control Services, Plymouth, MA, for sign replacement on I-93 NB and SB mainline at Exits 25, 27 and 28, on the basi | contract | $214,154 | approved |
| 05/01/19 | #27 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Northeast Traffic Control Services, Plymouth, MA, for horizontal curve signs on all state owned roadways in maintenance District 1, o | contract | $792,465 | approved |