Top Departments
| Department | Items | Total |
|---|---|---|
| DEPARTMENT OF TRANSPORTATION | 4 | $22.6M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 4 | $22.6M |
Items
| Date | Item | Department | Description | Type | Amount | Outcome |
|---|---|---|---|---|---|---|
| 08/27/25 | #14B | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Sargent Corporation, Orono, ME, on the basis of a low bid of $4,599,905, for installation of median barrier on I-95 starting at mile | contract | $4.6M | approved |
| 12/18/24 | #37 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Sargent Corporation, Orono, ME, on the basis of a low bid of $2,479,850 for replacement of the bridge carrying Georges Mills Road ove | contract | $2.5M | approved |
| 11/29/23 | #29 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Sargent Corporation, Orono, ME, on the basis of a low bid of $732,429.50 for culvert and retaining wall project located on Meredith N | contract | $732,430 | approved |
| 01/24/18 | #17 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with Sargent Corporation, Stillwater, ME, for roadway reconstruction and widening NH Route 12 from the intersection of Main Street in Nort | contract | $14.8M | approved |