Top Departments
| Department | Items | Total |
|---|---|---|
| DEPARTMENT OF TRANSPORTATION | 10 | $35.5M |
| 1 | $434,144 |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 10 | $35.3M |
| nomination | 1 | $646,290 |
Items
| Date | Item | Department | Description | Type | Amount | Outcome |
|---|---|---|---|---|---|---|
| 12/18/24 | #46F | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard, Inc., Barton, VT, on the basis of a low bid of $12,923,145.50 for bridge rehabilitation at the Ashland-Bridgewater town | contract | $12.9M | approved |
| 10/16/24 | #27 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard, Inc., Barton, VT, on the basis of a sole bid of $1,147,769, for replacement of an existing concrete box culvert on Route | contract | $1.1M | approved |
| 06/14/23 | #74E | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard, Inc., Barton, VT, on the basis of a sole bid of $9,922,107, for widening and rehabilitation of NH 16, from the Dummer-Ca | contract | $9.9M | approved |
| 12/21/22 | #44B | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard, Inc., Barton, VT, on the basis of a low bid of $847,690 for bridge preservation response to stabilize two bridges in Dor | contract | $847,690 | approved |
| 11/22/22 | #52 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard, Inc., Barton, VT, on the basis of a single bid of $2,867,411 for bridge preservation of the Ledyard Bridge carrying NH 1 | contract | $2.9M | approved |
| 09/07/22 | #42 | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard, Inc., Barton, VT, on the basis of a low bid of $434,144 for replacement of a corrugated metal culvert carrying an unname | contract | $434,144 | approved | |
| 06/10/20 | #30 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard Inc., Barton, VT, for roadway slope repair on NH 16, on the basis of a single bid of $1,069,513. (2)Further authorize a c | contract | $1.1M | approved |
| 02/20/19 | #31 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard Inc., Barton, VT, for culvert rehabilitation/replacement located east of NH 142 (Maple Street), carrying an unnamed tribu | contract | $894,109 | approved |
| 01/23/19 | #40 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard Inc., Barton, VT, for reconstructing railway-highway crossing, roadway approaches and protective devices on US 302 in Bar | contract | $828,633 | approved |
| 01/23/19 | #43 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard Inc., Barton, VT, for widening and reconstruction between NH 110A and Dummer Pond Road, on the basis of a low bid of $4,3 | contract | $4.4M | approved |
| 01/28/15 | #29 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard Inc., Belmont, NH, for rehabilitation of the Guildhall Road bridge over the Connecticut River between Guildhall, VT and N | nomination | $646,290 | approved |