Top Vendors
| Vendor | Items | Total |
|---|---|---|
| Pike Industries Inc. | 117 | $502.2M |
| R.S. Audley Inc. | 30 | $429.4M |
| Continental Paving Inc. | 83 | $373.5M |
| Cubic Transportation Systems Inc. | 3 | $337.0M |
| State of Maine | 4 | $213.0M |
| state of Maine | 1 | $176.7M |
| Xerox State and Local Solution | 2 | $140.2M |
| SPS New England Inc. | 3 | $115.1M |
| Alvin J. Coleman & Son Inc. | 19 | $107.8M |
| Weaver Brothers Construction Company Inc. | 5 | $96.5M |
| Brox Industries Inc. | 23 | $89.1M |
| Archer Western Contractors LLC | 1 | $83.9M |
| Reed & Reed General Contractors | 2 | $78.2M |
| Severino Trucking Co Inc. | 1 | $67.1M |
| E.D. Swett Inc. | 12 | $67.1M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 1,572 | $4.21B |
| other | 1,466 | $3.45B |
| grant | 215 | $290.6M |
| transfer | 173 | $311.3M |
| nomination | 117 | $109.2M |
| amendment | 107 | $331.5M |
| lease | 102 | $25.2M |
| payment | 39 | $1.4M |
| permit | 38 | $10.7M |
| personnel | 15 | $100.3M |
| report | 12 | $5.7M |
| settlement | 4 | $5.0M |
| expenditure | 2 | $46,329 |
| waiver | 1 | $250,000 |
Spending by Year
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 05/05/21 | #17 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing various Tier 2, 3, and 4 roads throughout 13 towns in District 3, on the basis of | Pike Industries Inc. | $3.8M | approved |
| 05/05/21 | #18 | Authorize the Bureau of Construction to enter into a contract with R.M. Piper Inc., Plymouth, NH, for bridge preservation work for two bridges located in the Towns of Bartlett and Jackson, on the basi | R.M. Piper Inc. | $739,421 | approved |
| 05/05/21 | #19 | Authorize the Bureau of Right of Way to pay a property owner $32,000 as documented in the Contemplated Damage Awards List for amounts greater than $5,000 for the period extending from April 12, 2021 t | $32,000 | approved | |
| 05/05/21 | #20 | Authorize the Bureau of Right of Way to pay a property owner $475,000 as documented in the Contemplated Awards List, for amounts greater than $5,000 for the period extending from April 8, 2021 through | $475,000 | approved | |
| 05/05/21 | #21 | Authorize the Bureau of Right of Way to submit the Contemplated Awards List for amounts less than $5,000, for the sum total of $42,006.82 for the period extending from January 1, 2021 through March 31 | $42,007 | approved | |
| 05/05/21 | #22 | Authorize the Bureau of Right of Way to sell a 0.15+/- acre portion of State-owned Limited Access Right of Way located on the northwesterly side of NH Route 132 in the Town of Northfield, to the abutt | $5,000 | approved | |
| 05/05/21 | #23 | Authorize the Bureau of Right of Way to sell a 1.30+/- acre parcel of State-owned land, with improvements located at 9 Tracy Drive in the Town of Derry, to Alberto Santiago & Rachel Ferreira for $303, | $303,000 | approved | |
| 05/05/21 | #24 | Authorize the Bureau of Right of Way to sell a 2.04+/- acre parcel of State-owned land with improvements that is located at 23 Spinnaker Drive in the Town of Derry, to Cristian Jorge for $340,000 plus | $340,000 | approved | |
| 05/05/21 | #25 | Authorize the Bureau of Environment to enter into an agreement with Hoyle, Tanner & Associates Inc., Manchester, NH, for on-call environmental services for various projects and facilities located thro | Hoyle, Tanner & Associates Inc | $500,000 | approved |
| 05/05/21 | #26 | Authorize the Bureau of Materials & Research to enter into a sole source Cooperative Project Agreement with the University of NH Sponsored Programs Administration, Durham, NH, for a cooperative evalua | University of NH Sponsored Pro | $159,757 | approved |
| 05/05/21 | #27 | Authorize the Bureau of Materials & Research to enter into a sole source Cooperative Project Agreement with the University of NH Sponsored Programs Administration, Durham, NH, for a cooperative evalua | University of NH Sponsored Pro | $87,862 | approved |
| 05/05/21 | #28 | Authorize the Bureau of Rail & Transit to enter into a loan agreement with the Mount Washington Railway Company, Mount Washington, NH, for rail replacement materials, construction of re-rail installat | Mount Washington Railway Compa | $1.2M | approved |
| 05/05/21 | #29 | Authorize the Bureau of Rail & Transit to enter into a retroactive lease agreement with Raymond Spinosa, Laconia, NH, for the use of state-owned railroad property in Laconia, NH along Lake Winnipesauk | Raymond Spinosa | $9,242 | approved |
| 05/05/21 | #30 | Authorize the Bureau of Environment to enter into an agreement with McFarland-Johnson Inc., Concord, NH, for on-call environmental services for various projects and facilities located throughout the S | McFarland-Johnson Inc. | $500,000 | approved |
| 05/05/21 | #36 | Authorize to enter into an agreement with NH Association for the Blind, Trade Name Future In Sight, Concord, NH, for the distribution of telecommunications equipment, in an amount not to exceed $182,7 | NH Association for the Blind, | $182,768 | approved |
| 04/21/21 | #20 | Authorize the Bureau of Right of Way to pay property and business owners $59,250 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from March 17, 2 | $59,250 | approved | |
| 04/21/21 | #21 | Authorize the Bureau of Right of Way to sell a 0.28 +/- acre parcel of State owned land located in Nashua to 169 DW Highway LLC (Grantee), for $71,100, which includes a $1,100 administrative fee. Orig | $71,100 | approved | |
| 04/21/21 | #22 | Authorize the Bureau of Mechanical Services to enter into a contract with Consolidated Utility Equipment Service Incorporated, Amherst, NH, for providing Yard Crane Inspection, repair, scheduled servi | Consolidated Utility Equipment | $70,637 | approved |
| 04/21/21 | #23 | Authorize the Bureau of Aeronautics to enter into a memorandum of understanding with the Town of Fryeburg, ME, to reimburse for a portion of the non-federal share associated with a Federal Aviation Ad | $75,000 | approved | |
| 04/21/21 | #24 | Authorize the Bureau of Environment to enter into an agreement with Northeast Archaeology Research Center Inc., Farmington, ME, for on-call archaeology services for various projects and facilities loc | Northeast Archaeology Research | $200,000 | approved |
| 04/21/21 | #25 | Authorize the Bureau of Rail & Transit to pay an amount not to exceed $547,089 to Advance Transit Inc., Wilder, VT, to procure two replacement ADA accessible transit buses and maintenance equipment. E | $547,089 | approved | |
| 04/21/21 | #26 | Authorize the Bureau of Highway Design to enter into an agreement with McFarland-Johnson Inc., Concord, NH, to perform final design to address transportation system needs along approximately 8.2 miles | McFarland-Johnson Inc. | $9.9M | approved |
| 04/21/21 | #27 | Authorize the Bureau of Turnpikes to enter into an agreement with Jacobs Engineering Group Inc., Bedford, NH, for on-call Turnpike-related consulting services, for an amount not to exceed $600,000. Ef | Jacobs Engineering Group Inc. | $600,000 | approved |
| 04/21/21 | #28 | Authorize the Bureau of Highway Maintenance, Well Section, to enter into a contract with Wragg Bros., of Vermont, Inc., Ascutney, VT, for the decommissioning of three wells in the Towns of Chester, Ho | Wragg Bros., of Vermont, Inc. | $12,780 | approved |
| 04/21/21 | #29 | Authorize the Bureau of Construction to enter into a contract with GMI Asphalt LLC, Belmont, NH, for resurfacing of approximately 25 miles of roadways in Districts 2 and 4 on the basis of a low bid of | GMI Asphalt LLC | $1.3M | approved |
| 04/21/21 | #30 | Authorize the Bureau of Construction to enter into a contract with Annseal Inc., Johnson City, NY, for roadway resurfacing including crack sealing in Districts 3, 4, 5 and 6, on the basis of a low bid | Annseal Inc. | $599,521 | approved |
| 04/21/21 | #31 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing approximately 23.5 miles of various Tier 2, 3, and 4 roadways in District 6 | Continental Paving Inc. | $2.4M | approved |
| 04/21/21 | #32 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing various Tier 2, 3 and 4 roads throughout 11 towns in District 1, on the basis of a | Pike Industries Inc. | $3.5M | approved |
| 04/21/21 | #33 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing various Tier 2, 3 and 4 roads throughout 11 towns in District 5, on the basis of a | Pike Industries Inc. | $3.7M | approved |
| 04/07/21 | #16 | Authorize the Bureau of Right of Way to pay property owners $32,750 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from February 11, 2021 throug | $32,750 | approved | |
| 04/07/21 | #17 | Authorize the Bureau of Right of Way to pay a business owner $22,500 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from March 2, 2021 through M | $22,500 | approved | |
| 04/07/21 | #18 | Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, to perform final design to address transportation system needs along NH Route 102 in t | Vanasse Hangen Brustlin Inc. | $10.8M | approved |
| 04/07/21 | #19 | Authorize the Bureau of Planning & Community Assistance to enter into a sole source Project Agreement with the University of NH, Earth System Research Center, Durham, NH, to administer the acquisition | University of NH, Earth System | $76,200 | approved |
| 04/07/21 | #20 | Authorize the Bureau of Aeronautics to provide funding to the City of Keene, NH, to conduct a reimbursable agreement with Federal Aviation Administration Technical Operations for the Dillant-Hopkins A | Federal Aviation Administratio | $35,150 | approved |
| 04/07/21 | #21 | Authorize the Bureau of Environment to enter into an agreement with Monadnock Archaeological Consulting LLC, Dublin, NH, for on-call archaeology services for various projects and facilities located th | Monadnock Archaeological Consu | $200,000 | approved |
| 04/07/21 | #22 | Authorize the Bureau of Environment to enter into an agreement with Heritage Consultants LLC, Newington, CT, for on-call archaeology services for various projects and facilities located throughout the | Heritage Consultants LLC | $200,000 | approved |
| 04/07/21 | #22A | Authorize the Bureau of Construction to enter into a contract with GMI Asphalt LLC, Belmont, NH, for resurfacing of approximately 30 miles of roadways in District 2, on the basis of a low bid of $2,36 | GMI Asphalt LLC | $2.4M | approved |
| 04/07/21 | #22B | Authorize the Bureau of Construction to enter into a contract with Vermont Recreational Surfacing & Fencing Inc., Barnet, VT, for guardrail replacement in Maintenance District 2 along NH 10 (Tier 3) i | Vermont Recreational Surfacing | $1.1M | approved |
| 03/24/21 | #18 | Authorize the Division of Operations to transfer $525,000 from the Highway Surplus Account to fund winter maintenance activities. Effective upon G&C approval through June 30, 2021. 100% Highway Funds. | $525,000 | approved | |
| 03/24/21 | #19 | Authorize the Bureau of Highway Design to retroactively amend a contract with McFarland-Johnson Inc (originally approved by G&C on 9-20-18, item #30), to perform the design services for improvements t | $1.4M | approved | |
| 03/24/21 | #20 | Authorize the Bureau of Bridge Design to enter into an agreement with Hardesty & Hanover LLC, New York, NY, for on-call engineering services for various bridge projects located throughout the State, f | Hardesty & Hanover LLC | $1.0M | approved |
| 03/24/21 | #21 | Authorize the Bureau of Bridge Design to enter into an agreement with Stantec Consulting Services Inc., Auburn, NH, for on-call engineering for various bridge projects located throughout the State, fo | Stantec Consulting Services In | $1.0M | approved |
| 03/24/21 | #22 | Authorize the Bureau of Bridge Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, for on-call engineering for various bridge projects located throughout the State, for a | Vanasse Hangen Brustlin Inc. | $1.0M | approved |
| 03/24/21 | #23 | Authorize the Bureau of Bridge Design to enter into an agreement with Greenman-Pedersen Inc., Portsmouth, NH, for on-call engineering for various bridge projects located throughout the State, for a to | Greenman-Pedersen Inc. | $1.0M | approved |
| 03/24/21 | #25 | Authorize the Bureau of Rail & Transit to enter into a sole source contract amendment with Boston Express Bus Inc., Concord, NH (originally approved by G&C on 1-10-07, item #123A), to continue to main | $5.8M | approved | |
| 03/24/21 | #26 | Authorize the Bureau of Rail & Transit to enter into a sole source contract amendment with Boston Express Bus Inc., Concord, NH (originally approved by G&C on 1-16-08, item #214), to continue to maint | $21.6M | approved | |
| 03/24/21 | #27 | Authorize the Bureau of Environment to enter into an agreement with Preservation Company, Kensington, NH, for on-call architectural history services for various projects and facilities located through | Preservation Company | $200,000 | approved |
| 03/24/21 | #28 | Authorize the Bureau of Environment to enter into an agreement with Hunter Research Inc., Trenton, NJ, for on-call architectural history services for various projects and facilities located throughout | Hunter Research Inc. | $200,000 | approved |
| 03/24/21 | #29 | Authorize the Bureau of Right of Way to sell an 18,000 +/- square foot parcel of land located just north of the Route 28A/Route 28 Intersection in the Town of Alton, directly to Thomas and Virginia St | $5,600 | approved | |
| 03/24/21 | #30 | Authorize the Bureau of Turnpikes to enter into an agreement with HNTB Corporation., Concord, NH, for on-call Turnpike-related consulting services, for an amount not to exceed $600,000. Effective upon | HNTB Corporation. | $600,000 | approved |