Top Vendors
| Vendor | Items | Total |
|---|---|---|
| R.S. Audley Inc. | 3 | $59.6M |
| Pike Industries Inc. | 7 | $30.8M |
| Continental Paving Inc. | 3 | $12.0M |
| Brox Industries Inc. | 3 | $10.8M |
| ExeVision Inc. | 1 | $5.8M |
| AECOM Technical Services Inc. | 1 | $5.4M |
| GMI Asphalt LLC | 2 | $4.7M |
| C.W. Sliter & Sons LLC d/b/a CWS Fence & Guardrail Co. | 4 | $3.5M |
| Pathway Services Inc. | 2 | $3.1M |
| AssetWorks LLC | 1 | $2.9M |
| Eurovia Atlantic Coast LLC | 1 | $2.8M |
| Evroks Corporation | 2 | $2.7M |
| R.M. Piper Inc. | 2 | $2.3M |
| Southern Road & Bridge LLC | 1 | $1.9M |
| J Hutchins Inc. | 1 | $1.8M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 105 | $215.9M |
| other | 104 | $51.3M |
| transfer | 10 | $48.0M |
| grant | 6 | $14.9M |
| permit | 5 | $227,100 |
| lease | 4 | $170,524 |
| amendment | 4 | $17,625 |
| payment | 3 | $142,679 |
| settlement | 2 | $1.4M |
| personnel | 2 | $578,444 |
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 06/24/20 | #55 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with County of Cheshire, Keene, NH (originally approved by G&C on 5-5-19, item #37C), for coordinated transportation services | $326,666 | approved | |
| 06/24/20 | #56 | Authorize the Bureau of Construction to enter into a contract with R.S. Audley Inc., Bow, NH, for superstructure replacement and widening of I-89 NB and SB over the Connecticut River (Br. No. 044/103 | R.S. Audley Inc. | $43.8M | approved |
| 06/24/20 | #57 | Authorize the Bureau of Construction to enter into a contract with C.W. Sliter & Sons LLC d/b/a CWS Fence & Guardrail Co., Andover, NH, for repair of damaged beam guardrail on Tier 1 roadways within D | C.W. Sliter & Sons LLC d/b/a C | $489,278 | approved |
| 06/24/20 | #58 | Authorize the Bureau of Construction to enter into a contract with C.W. Sliter & Sons LLC d/b/a CWS Fence & Guardrail Co., Andover, NH, for guardrail replacement in Districts 5 & 6, on the basis of a | C.W. Sliter & Sons LLC d/b/a C | $899,774 | approved |
| 06/24/20 | #59 | Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for culvert rehab and replacement in Shelburne, NH, on the basis of a low bid of $596,376.75 | Alvin J. Coleman & Son Inc. | $596,377 | approved |
| 06/24/20 | #60 | Authorize the Bureau of Bridge Design to amend a contract with Vanasse Hangen Brustlin Inc., (originally approved by G&C on 8-26-15, item #30), to study and prepare preliminary engineering plans for r | Vanasse Hangen Brustlin Inc., | approved | |
| 06/24/20 | #61 | Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract amendment with Southwest Research Institute, San Antonio, TX (originally approved by G&C on 5-23-14, i | $8.1M | approved | |
| 06/24/20 | #62 | Authorize the Bureau of Transportation Systems Management and Operations to enter into a contract with Tilson Technology Management Inc., Portland, ME, for the purpose of providing Statewide Intellige | Tilson Technology Management I | $184,830 | approved |
| 06/24/20 | #63 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Nashua Regional Planning Commission, Merrimack, NH (originally approved by G&C on 5-15-19, item #37A), for coordinated tr | $304,062 | approved | |
| 06/24/20 | #64 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Mount Washington Valley Economic Council Inc., Conway, NH (originally approved by G&C on 5-15-19, item #37J), for coordin | $194,268 | approved | |
| 06/24/20 | #65 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Southern NH Planning Commission, Manchester, NH (originally approved by G&C on 6-5-19, item #46), for coordinated transpo | $634,112 | approved | |
| 06/24/20 | #66 | Authorize the Bureau of Highway Maintenance, Well Section, to enter into a contract with Skillings & Sons Inc., Amherst, NH, for a 6-inch drilled well and pump on the property of Vickie Frye, Hopkinto | Skillings & Sons Inc. | $18,040 | approved |
| 06/24/20 | #67 | Authorize the Bureau of Rail & Transit to enter into vehicle agreements with the subrecipients as detailed in letter dated May 8, 2020. Effective upon G&C approval through the date the vehicles are di | approved | ||
| 06/24/20 | #68 | Authorize the Bureau of Construction to enter into a contract with R.S. Audley Inc., Bow, NH, for roadway widening of NH 106, on the basis of a low bid of $7,413,784. (2)Further authorize a contingenc | R.S. Audley Inc. | $7.4M | approved |
| 06/24/20 | #69 | Authorize the Bureau of Construction to enter into a contract with Alvin J. Coleman & Son Inc., Conway, NH, for covered bridge scour protection, on the basis of a low bid of $536,890. (2)Further autho | Alvin J. Coleman & Son Inc. | $536,890 | approved |
| 06/24/20 | #70 | Authorize the Bureau of Construction to enter into a contract with Brox Industries Inc., Dracut, MA, for roadway resurfacing on the basis of a low bid of $1,685,379.87. (2)Further authorize a continge | Brox Industries Inc. | $1.7M | approved |
| 06/24/20 | #71 | Authorize the Bureau of Construction to enter into a contract with Vermont Recreational Surfacing & Fencing Inc., Barnet, VT, for guardrail replacement in Districts 1 and 3 on the basis of a low bid o | Vermont Recreational Surfacing | $286,710 | approved |
| 06/10/20 | #22 | Authorize the Division of Operations to accept and expend revenue in the amount of $1,400,000 from the Environmental Mitigation Trust Agreement for State Beneficiaries from the Volkswagen Settlement F | $1.4M | approved | |
| 06/10/20 | #23 | Authorize the Division of Operations to transfer $502,000 between various accounts and classes. Effective upon G&C approval through June 30, 2021. Contingent upon Fiscal Committee approval on June 12, | $502,000 | approved | |
| 06/10/20 | #24 | Authorize the Division of Finance to transfer $2,500,000 between expenditure classes and subsequently establish new expense class 085. Effective upon G&C approval through June 30, 2021. Contingent upo | $2.5M | approved | |
| 06/10/20 | #25 | Authorize the Bureau of Right of Way to pay property owners $840,000 as documented in the Contemplated Awards List, for amounts greater than $5,000 for the period extending from April 28, 2020 through | $840,000 | approved | |
| 06/10/20 | #26 | Authorize the Bureau of Highway Maintenance, Well Section, to enter into a contract with Skillings & Sons Inc., Amherst, NH, for a 6-inch drilled well and pump on the property of Judi Lacroix, Weare, | Skillings & Sons Inc. | $20,515 | approved |
| 06/10/20 | #27 | Authorize the Bureau of Highway Maintenance, Well Section, to enter into a contract with N. A. Manosh Inc., Morrisville, VT, for a 6-inch drilled well and pump on the property of Lori Child, Chester, | N. A. Manosh Inc. | $24,996 | approved |
| 06/10/20 | #28 | Authorize the Bureau of Transportation Systems Management & Operations to enter into a contract with R&R Communications Inc., Swanzey, NH, for the purpose of providing statewide service and repairs to | R&R Communications Inc. | $161,000 | approved |
| 06/10/20 | #29 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for safety improvements and resurfacing, on the basis of a low bid of $1,307,984.25. (2)Further au | Pike Industries Inc. | $1.3M | approved |
| 06/10/20 | #30 | Authorize the Bureau of Construction to enter into a contract with J.P. Sicard Inc., Barton, VT, for roadway slope repair on NH 16, on the basis of a single bid of $1,069,513. (2)Further authorize a c | J.P. Sicard Inc. | $1.1M | approved |
| 06/10/20 | #31 | Authorize the Bureau of Construction to enter into a contract with L&D Safety Marking Corp., Barre, VT, for pavement marking, on the basis of a low bid of $208,870.75. Effective upon G&C approval thro | L&D Safety Marking Corp. | $208,871 | approved |
| 06/10/20 | #32 | Authorize the Bureau of Bridge Design to enter into an agreement with Kleinfelder Northeast Inc., Manchester, NH, for the final design to replace the Red List bridge carrying NH Route 101 over Pulpit | Kleinfelder Northeast Inc. | $314,758 | approved |
| 06/10/20 | #33 | Authorize the Bureau of Aeronautics to accept federal funding from the Federal Aviation Administration to fund airport planning and development projects at the Portsmouth International Airport at Peas | $998,000 | approved | |
| 06/10/20 | #34 | Authorize the Bureau of Aeronautics to provide funding retroactively to the City of Claremont, NH, for SBG 02-13-2020, for Phase 1, to design, permit, bid and provide technical observation of the reco | $207,100 | approved | |
| 05/20/20 | #19 | Authorize the Bureau of Right of Way’s request to pay property owners $1,230,000 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from April 15, 2 | $1.2M | approved | |
| 05/20/20 | #19A | Authorize the Division of Project Development to transfer $15,400,000 between various accounts and classes. Effective upon G&C approval through June 30, 2020. Fiscal Committee approved. | $15.4M | approved | |
| 05/20/20 | #19B | Authorize the Bureau of Right of Way to pay property owners $3,225,000 as documented in the Contemplated Awards List, for amounts greater than $5,000 for the period extending from March 20, 2020 throu | $3.2M | approved | |
| 05/20/20 | #20 | Authorize the Bureau of Traffic to accept and expend revenue in the amount of $50,000 from the National Highway Traffic Safety Administration through NH Department of Safety, Office of Highway Safety, | $50,000 | approved | |
| 05/20/20 | #21 | Authorize the Bureau of Construction to enter into a contract with TMI Services Inc., Franklin, MA, for replacement of pavement markings along the Turnpike system, on the basis of a low bid of $1,010, | TMI Services Inc. | $1.0M | approved |
| 05/20/20 | #22 | Authorize the Bureau of Highway Design to amend a contract with Vanasse Hangen Brustlin Inc., (originally approved by G&C on 2-1-17, item #26), for preliminary design of improvements to US 202 at its | approved | ||
| 05/06/20 | #48 | Authorize the Division of Project Development to transfer $15,400,000 between various accounts and classes. Effective upon G&C approval through June 30, 2020. Contingent upon Fiscal Committee approval | $15.4M | withdrawn | |
| 05/06/20 | #49 | Authorize to accept and place on file the Bureau of Right of Way’s Contemplated Awards List for amounts less than $5,000 for the sum total of $22,600.33 for the period extending from January 1, 2020 t | $22,600 | approved | |
| 05/06/20 | #50 | Authorize the Bureau of Turnpikes to exercise a contract renewal option with Conduent State and Local Solutions Inc., Germantown, MD (originally approved by G&C on 5-23-12, item #104), for toll mainte | $22.5M | approved | |
| 05/06/20 | #51 | Authorize the Bureau of Highway Design to enter into an agreement with CHA Consulting Inc., Keene, NH, for Part B final design services to widen 1.3 miles of the F. E. Everett Turnpike in the Town of | CHA Consulting Inc. | $1.7M | approved |
| 05/06/20 | #52 | Authorize the Bureau of Highway Design to enter into an agreement with WSP USA Solutions Inc., (formerly known as Louis Berger U.S. Inc.), Manchester, NH, for preliminary design of improvements to 1.4 | WSP USA Solutions Inc., (forme | $759,728 | approved |
| 05/06/20 | #53 | Authorize the Bureau of Construction to enter into a contract with C.W. Sliter & Sons LLC, d/b/a CWS Fence & Guardrail Co., Andover, NH, for guardrail replacement, on the basis of a low bid of $1,032. | C.W. Sliter & Sons LLC, d/b/a | $51,608 | approved |
| 05/06/20 | #54 | NOT USED | not_used | ||
| 05/06/20 | #55 | NOT USED | not_used | ||
| 05/06/20 | #56 | Authorize the Bureau of Right of Way to pay property owners $3,225,000 as documented in the Contemplated Awards List, for amounts greater than $5,000 for the period extending from March 20, 2020 throu | $3.2M | withdrawn | |
| 05/06/20 | #57 | Authorize the Bureau of Materials and Research to enter into a contract with Pathway Services Inc., Tulsa, OK, for the purchase of one 2020 Ford Transit 350 Crew Van, in the amount of $43,000. Effecti | Pathway Services Inc. | $43,000 | approved |
| 05/06/20 | #58 | Authorize the Bureau of Highway Maintenance to enter into an agreement with WSP USA Inc., Merrimack, NH, for on-call engineering/technical services for various Bureau of Highway Maintenance, Bridge Ma | WSP USA Inc. | $750,000 | approved |
| 05/06/20 | #59 | Authorize the Bureau of Environment to enter into an agreement with Harris Miller Miller & Hanson, Inc., Burlington, MA, for on-call engineering and support services for transportation-related project | Harris Miller Miller & Hanson, | $250,000 | approved |
| 05/06/20 | #60 | Authorize the Bureau of Environment to enter into an agreement with VHB Inc., Bedford, NH, for on-call engineering and support services for transportation-related project-level air quality and/or nois | VHB Inc. | $250,000 | approved |
| 05/06/20 | #61 | Authorize the Bureau of Aeronautics to provide funding to the City of Claremont, NH, to conduct an Environmental Assessment Study for the Claremont Municipal Airport in Claremont, NH, in the amount of | $36,898 | approved |