Top Vendors
| Vendor | Items | Total |
|---|---|---|
| Cubic Transportation Systems Inc. | 1 | $102.5M |
| Reed & Reed General Contractors | 1 | $61.2M |
| Pike Industries Inc. | 8 | $31.0M |
| R.S. Audley Inc. | 2 | $24.0M |
| Continental Paving Inc. | 5 | $23.5M |
| Brox Industries Inc. | 3 | $17.9M |
| McFarland-Johnson Inc. | 6 | $16.8M |
| Vanasse Hangen Brustlin Inc. | 4 | $14.6M |
| GMI Asphalt LLC | 6 | $10.7M |
| Green Mountain Communications Inc. | 2 | $9.9M |
| E.D. Swett Inc. | 2 | $9.3M |
| Advance Transit Inc. | 1 | $6.2M |
| Weaver Brothers Construction Co Inc. | 2 | $5.6M |
| WSP USA Inc. | 4 | $4.5M |
| R.M. Piper Inc. | 4 | $4.4M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 136 | $389.0M |
| other | 128 | $88.1M |
| grant | 28 | $49.2M |
| lease | 22 | $205,031 |
| transfer | 9 | $7.9M |
| amendment | 4 | $2.5M |
| permit | 2 | |
| payment | 2 | $65,675 |
| personnel | 1 | $91.0M |
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 06/02/21 | #37 | Authorize the Bureau of Highway Maintenance, Well Section, to enter into a contract with Skillings & Sons LLC, Amherst, NH, for a 6-inch drilled well and pump on the property of Philip Miles, Greenlan | Skillings & Sons LLC | $30,550 | approved |
| 06/02/21 | #38 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for pavement rehabilitation and preservation on 14 miles of NH 101 in Milford and Amherst, on the | Pike Industries Inc. | $6.2M | approved |
| 06/02/21 | #39 | Authorize the Bureau of Construction to enter into a contract with Brox Industries Inc., Dracut, MA, for resurfacing 18 miles of Tier 2 roadways in Districts 4, 5 and 6, on the basis of a low bid of $ | Brox Industries Inc. | $4.2M | approved |
| 06/02/21 | #40 | Authorize the Bureau of Construction to enter into a contract with F.L. Merrill Construction Inc., Loudon, NH, for culvert replacement under NH 107 in Northwood, on the basis of a low bid of $425,184. | F.L. Merrill Construction Inc. | $425,184 | approved |
| 06/02/21 | #41 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing of approximately 12.5 miles of various Tier 3 and 4 roadways throughout 3 towns in | Pike Industries Inc. | $989,040 | approved |
| 06/02/21 | #42 | Authorize the Bureau of Construction to enter into a contract with K5 Corporation of Rockland, MA, for maintenance of select stenciled and transverse line pavement markings statewide, on the basis of | K5 Corporation of Rockland, MA | $192,289 | approved |
| 06/02/21 | #43 | Authorize the Bureau of Construction to enter into an agreement with McFarland-Johnson Inc., Concord, NH, to provide on-call construction engineering and inspection services for various transportation | McFarland-Johnson Inc. | $1.9M | approved |
| 06/02/21 | #44 | Authorize the Bureau of Construction to enter into an agreement with John Turner Consulting Inc., North Hampton, NH, to provide on-call construction engineering and inspection services for various tra | John Turner Consulting Inc. | $1.9M | approved |
| 06/02/21 | #45 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for pavement resurfacing on NH 101 in Exeter and Hampton in District 6, on the basis of a l | Continental Paving Inc. | $7.0M | approved |
| 06/02/21 | #45A | Authorize the Bureau of Turnpikes to amend a contract with Cubic Transportation Systems Inc., San Diego, CA (originally approved by G&C on 10-7-15, item #25), for E-Zpass credit card transaction fees | Cubic Transportation Systems I | $102.5M | approved |
| 05/19/21 | #29 | Authorize the Bureau of Right of Way to enter into a sole source agreement with Maine Technical Source Inc., Yarmouth, ME, for the purposes of providing a department-wide subscription to SmartNet lice | Maine Technical Source Inc. | $10,526 | approved |
| 05/19/21 | #30 | Authorize the Bureau of Construction to enter into an agreement with Greenman-Pedersen Inc., Bedford, NH, to provide on-call construction engineering and inspection services for various transportation | Greenman-Pedersen Inc. | $1.9M | approved |
| 05/19/21 | #31 | Authorize the Bureau of Highway Design to pay a retroactive invoice to Plymouth & Lincoln Railroad Corporation, Lincoln, NH, for work performed between December 30, 2018 and January 11, 2020. 100% Oth | approved | ||
| 05/19/21 | #32 | Authorize the Bureau of Materials & Research to enter into a sole source Cooperative Project Agreement with Plymouth State University Sponsored Programs Administration, Plymouth, NH, for a cooperative | Plymouth State University Spon | $100,973 | approved |
| 05/19/21 | #33 | Authorize the Bureau of Highway Design to enter into an agreement with WSP USA Inc., Merrimack, NH, for on-call railroad services for various transportation projects located throughout the State, for | WSP USA Inc. | $750,000 | approved |
| 05/19/21 | #34 | Authorize the Bureau of Highway Maintenance, Well Section, to enter into a contract with Skillings & Sons LLC of Amherst, NH, for a 6-inch drilled well and pump on the property of Bill Hand, Danville, | Skillings & Sons LLC of Amhers | $28,575 | approved |
| 05/19/21 | #35 | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for bridge replacement and widening in Peterborough at the intersection of US 202 and NH 101, on the ba | E.D. Swett Inc. | $8.5M | approved |
| 05/05/21 | #16 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing approximately 35.7 miles of various Tier 3 and 4 roadways in District 4 and | Continental Paving Inc. | $2.3M | approved |
| 05/05/21 | #17 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing various Tier 2, 3, and 4 roads throughout 13 towns in District 3, on the basis of | Pike Industries Inc. | $3.8M | approved |
| 05/05/21 | #18 | Authorize the Bureau of Construction to enter into a contract with R.M. Piper Inc., Plymouth, NH, for bridge preservation work for two bridges located in the Towns of Bartlett and Jackson, on the basi | R.M. Piper Inc. | $739,421 | approved |
| 05/05/21 | #19 | Authorize the Bureau of Right of Way to pay a property owner $32,000 as documented in the Contemplated Damage Awards List for amounts greater than $5,000 for the period extending from April 12, 2021 t | $32,000 | approved | |
| 05/05/21 | #20 | Authorize the Bureau of Right of Way to pay a property owner $475,000 as documented in the Contemplated Awards List, for amounts greater than $5,000 for the period extending from April 8, 2021 through | $475,000 | approved | |
| 05/05/21 | #21 | Authorize the Bureau of Right of Way to submit the Contemplated Awards List for amounts less than $5,000, for the sum total of $42,006.82 for the period extending from January 1, 2021 through March 31 | $42,007 | approved | |
| 05/05/21 | #22 | Authorize the Bureau of Right of Way to sell a 0.15+/- acre portion of State-owned Limited Access Right of Way located on the northwesterly side of NH Route 132 in the Town of Northfield, to the abutt | $5,000 | approved | |
| 05/05/21 | #23 | Authorize the Bureau of Right of Way to sell a 1.30+/- acre parcel of State-owned land, with improvements located at 9 Tracy Drive in the Town of Derry, to Alberto Santiago & Rachel Ferreira for $303, | $303,000 | approved | |
| 05/05/21 | #24 | Authorize the Bureau of Right of Way to sell a 2.04+/- acre parcel of State-owned land with improvements that is located at 23 Spinnaker Drive in the Town of Derry, to Cristian Jorge for $340,000 plus | $340,000 | approved | |
| 05/05/21 | #25 | Authorize the Bureau of Environment to enter into an agreement with Hoyle, Tanner & Associates Inc., Manchester, NH, for on-call environmental services for various projects and facilities located thro | Hoyle, Tanner & Associates Inc | $500,000 | approved |
| 05/05/21 | #26 | Authorize the Bureau of Materials & Research to enter into a sole source Cooperative Project Agreement with the University of NH Sponsored Programs Administration, Durham, NH, for a cooperative evalua | University of NH Sponsored Pro | $159,757 | approved |
| 05/05/21 | #27 | Authorize the Bureau of Materials & Research to enter into a sole source Cooperative Project Agreement with the University of NH Sponsored Programs Administration, Durham, NH, for a cooperative evalua | University of NH Sponsored Pro | $87,862 | approved |
| 05/05/21 | #28 | Authorize the Bureau of Rail & Transit to enter into a loan agreement with the Mount Washington Railway Company, Mount Washington, NH, for rail replacement materials, construction of re-rail installat | Mount Washington Railway Compa | $1.2M | approved |
| 05/05/21 | #29 | Authorize the Bureau of Rail & Transit to enter into a retroactive lease agreement with Raymond Spinosa, Laconia, NH, for the use of state-owned railroad property in Laconia, NH along Lake Winnipesauk | Raymond Spinosa | $9,242 | approved |
| 05/05/21 | #30 | Authorize the Bureau of Environment to enter into an agreement with McFarland-Johnson Inc., Concord, NH, for on-call environmental services for various projects and facilities located throughout the S | McFarland-Johnson Inc. | $500,000 | approved |
| 05/05/21 | #36 | Authorize to enter into an agreement with NH Association for the Blind, Trade Name Future In Sight, Concord, NH, for the distribution of telecommunications equipment, in an amount not to exceed $182,7 | NH Association for the Blind, | $182,768 | approved |
| 04/21/21 | #20 | Authorize the Bureau of Right of Way to pay property and business owners $59,250 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from March 17, 2 | $59,250 | approved | |
| 04/21/21 | #21 | Authorize the Bureau of Right of Way to sell a 0.28 +/- acre parcel of State owned land located in Nashua to 169 DW Highway LLC (Grantee), for $71,100, which includes a $1,100 administrative fee. Orig | $71,100 | approved | |
| 04/21/21 | #22 | Authorize the Bureau of Mechanical Services to enter into a contract with Consolidated Utility Equipment Service Incorporated, Amherst, NH, for providing Yard Crane Inspection, repair, scheduled servi | Consolidated Utility Equipment | $70,637 | approved |
| 04/21/21 | #23 | Authorize the Bureau of Aeronautics to enter into a memorandum of understanding with the Town of Fryeburg, ME, to reimburse for a portion of the non-federal share associated with a Federal Aviation Ad | $75,000 | approved | |
| 04/21/21 | #24 | Authorize the Bureau of Environment to enter into an agreement with Northeast Archaeology Research Center Inc., Farmington, ME, for on-call archaeology services for various projects and facilities loc | Northeast Archaeology Research | $200,000 | approved |
| 04/21/21 | #25 | Authorize the Bureau of Rail & Transit to pay an amount not to exceed $547,089 to Advance Transit Inc., Wilder, VT, to procure two replacement ADA accessible transit buses and maintenance equipment. E | $547,089 | approved | |
| 04/21/21 | #26 | Authorize the Bureau of Highway Design to enter into an agreement with McFarland-Johnson Inc., Concord, NH, to perform final design to address transportation system needs along approximately 8.2 miles | McFarland-Johnson Inc. | $9.9M | approved |
| 04/21/21 | #27 | Authorize the Bureau of Turnpikes to enter into an agreement with Jacobs Engineering Group Inc., Bedford, NH, for on-call Turnpike-related consulting services, for an amount not to exceed $600,000. Ef | Jacobs Engineering Group Inc. | $600,000 | approved |
| 04/21/21 | #28 | Authorize the Bureau of Highway Maintenance, Well Section, to enter into a contract with Wragg Bros., of Vermont, Inc., Ascutney, VT, for the decommissioning of three wells in the Towns of Chester, Ho | Wragg Bros., of Vermont, Inc. | $12,780 | approved |
| 04/21/21 | #29 | Authorize the Bureau of Construction to enter into a contract with GMI Asphalt LLC, Belmont, NH, for resurfacing of approximately 25 miles of roadways in Districts 2 and 4 on the basis of a low bid of | GMI Asphalt LLC | $1.3M | approved |
| 04/21/21 | #30 | Authorize the Bureau of Construction to enter into a contract with Annseal Inc., Johnson City, NY, for roadway resurfacing including crack sealing in Districts 3, 4, 5 and 6, on the basis of a low bid | Annseal Inc. | $599,521 | approved |
| 04/21/21 | #31 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing approximately 23.5 miles of various Tier 2, 3, and 4 roadways in District 6 | Continental Paving Inc. | $2.4M | approved |
| 04/21/21 | #32 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing various Tier 2, 3 and 4 roads throughout 11 towns in District 1, on the basis of a | Pike Industries Inc. | $3.5M | approved |
| 04/21/21 | #33 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing various Tier 2, 3 and 4 roads throughout 11 towns in District 5, on the basis of a | Pike Industries Inc. | $3.7M | approved |
| 04/07/21 | #16 | Authorize the Bureau of Right of Way to pay property owners $32,750 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from February 11, 2021 throug | $32,750 | approved | |
| 04/07/21 | #17 | Authorize the Bureau of Right of Way to pay a business owner $22,500 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from March 2, 2021 through M | $22,500 | approved | |
| 04/07/21 | #18 | Authorize the Bureau of Highway Design to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, to perform final design to address transportation system needs along NH Route 102 in t | Vanasse Hangen Brustlin Inc. | $10.8M | approved |