Top Departments
| Department | Items | Total |
|---|---|---|
| DEPARTMENT OF TRANSPORTATION | 12 | $67.1M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 12 | $67.1M |
Items
| Date | Item | Department | Description | Type | Amount | Outcome |
|---|---|---|---|---|---|---|
| 12/17/25 | #22 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett, Inc., Concord, NH, on the basis of a sole bid of $8,130,402.50 for preservation of the bridge carrying the Rockingham Mal | contract | $8.1M | approved |
| 12/20/23 | #58 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett, Inc., Concord, NH, on the basis of a low bid of $10,099,519.60, for bridge preservation of five bridges on I-93 northboun | contract | $10.1M | approved |
| 10/27/21 | #38 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for bridge rehabilitation in Center Harbor and New Hampton, on the basis of a low bid of $800,945.85. ( | contract | $800,946 | approved |
| 05/19/21 | #35 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for bridge replacement and widening in Peterborough at the intersection of US 202 and NH 101, on the ba | contract | $8.5M | approved |
| 02/19/20 | #24 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for bridge preservation work in Boscawen, NH, on the basis of a low bid of $1,647,611.50. (2)Further au | contract | $1.6M | approved |
| 11/25/19 | #26 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for replacement and upgrade of signs and supports in five locations, on the basis of a low bid of $654, | contract | $654,426 | approved |
| 11/06/19 | #16 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for bridge rehabilitation efforts on I-89 NB, SB bridges over US Route 4 at Exit 19 and associated ramp | contract | $9.8M | approved |
| 12/05/18 | #42 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for NH 28 bridge preservation efforts for two bridges carrying NH 28 over the Suncook River and Beauty | contract | $897,859 | approved |
| 12/06/17 | #19 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for replacement of two “Red List” bridges, the Woodbury Avenue Bridge over US Route 1 bypass and the St | contract | $8.0M | approved |
| 08/24/16 | #34 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Belmont, NH, for the complete removal and replacement of the existing NH 153 bridge over the Cocheco River located i | contract | $2.1M | approved |
| 11/20/13 | #75 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for replacing the Maplewood Avenue Bridge over the US Route 1 Bypass in Portsmouth, on the basis of a l | contract | $3.9M | approved |
| 03/28/12 | #134 | DEPARTMENT OF TRANSPORTATION | Authorize the Bureau of Construction to amend a contract with E.D. Swett Inc., Concord, NH, (originally approved by G&C on 7-14-10, item #112), for the replacement of bridge decks on the I-93 bridges | contract | $12.7M | approved |