Top Vendors
| Vendor | Items | Total |
|---|---|---|
| Pike Industries Inc. | 117 | $502.2M |
| R.S. Audley Inc. | 31 | $444.9M |
| Continental Paving Inc. | 85 | $379.7M |
| Cubic Transportation Systems Inc. | 3 | $337.0M |
| State of Maine | 4 | $213.0M |
| state of Maine | 1 | $176.7M |
| Xerox State and Local Solution | 2 | $140.2M |
| SPS New England Inc. | 3 | $115.1M |
| Alvin J. Coleman & Son Inc. | 19 | $107.8M |
| Weaver Brothers Construction Company Inc. | 5 | $96.5M |
| Brox Industries Inc. | 23 | $89.1M |
| Archer Western Contractors LLC | 1 | $83.9M |
| Reed & Reed General Contractors | 2 | $78.2M |
| Severino Trucking Co Inc. | 1 | $67.1M |
| E.D. Swett Inc. | 12 | $67.1M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 1,587 | $4.26B |
| other | 1,473 | $3.45B |
| grant | 216 | $290.7M |
| transfer | 176 | $319.7M |
| nomination | 117 | $109.2M |
| lease | 109 | $25.7M |
| amendment | 108 | $331.5M |
| payment | 39 | $1.4M |
| permit | 38 | $10.7M |
| personnel | 15 | $100.3M |
| report | 12 | $5.7M |
| settlement | 4 | $5.0M |
| expenditure | 2 | $46,329 |
| waiver | 1 | $250,000 |
Spending by Year
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 10/03/18 | #25 | Authorize to award a grant to the City of Lebanon to acquire snow removal equipment for the Lebanon Municipal Airport, in the amount of $507,300. Effective upon G&C approval through August 16, 2022. 9 | $507,300 | approved | |
| 10/03/18 | #26 | Authorize the Bureau of Right of Way to pay property owners $9,000 as documented in the Contemplated Damage Awards List, for amounts greater than $5,000 for the period extending from August 28, 2018 t | $9,000 | approved | |
| 10/03/18 | #27 | Authorize the Bureau of Right of Way and Bureau of Highway Maintenance to pay property owners $17,980 as documented in the Contemplated Damage Awards List, for amounts greater than $5,000 for the peri | $17,980 | approved | |
| 10/03/18 | #28 | Authorize the Bureau of Construction to enter into a contract amendment with Evroks Corporation, Winnisquam, NH, for bridge preservation work on three bridges in the Towns of Andover and Danbury, by i | $1.8M | approved | |
| 10/03/18 | #29 | Authorize the Bureau of Rail and Transit to enter into a lease agreement with Bay Reach Realty Group for an 858 square foot parcel of state-owned railroad property located on the Concord-Lincoln Railr | Bay Reach Realty Group | $7,500 | approved |
| 10/03/18 | #30 | Authorize the Bureau of Transportation Systems Management & Operations to enter into a contract amendment with Tilson Technology Management Inc., Portland, ME (originally approved by G&C on 3-22-17, i | $4.4M | approved | |
| 10/03/18 | #31 | Authorize the Bureau of Right of Way to pay property owners $13,250 as documented in the Contemplated Damage Awards List for amounts greater than $5,000 for the period extending from August 7, 2018 th | $13,250 | approved | |
| 10/03/18 | #32 | Authorize the Bureau of Materials & Research to continue sole source participation in the American Association of State Highway and Transportation Officials resource accreditation program, Washington, | $20,000 | approved | |
| 10/03/18 | #33 | Authorize the Bureau of Mechanical Services to enter into a contract with Consolidated Utility Equipment Service Incorporated, Amherst, NH, for providing Yard Crane Inspection, repair, scheduled servi | Consolidated Utility Equipment | $84,717 | approved |
| 09/20/18 | #24 | Authorize the Bureau of Planning and Community Assistance to amend an agreement with the Town of Salem (originally approved by G&C on 1-16-08, item #211), by increasing the amount by $5,228,200 from $ | $6.1M | approved | |
| 09/20/18 | #25 | Authorize the Bureau of Aeronautics to award a grant to the City of Manchester, to remove obstructions (trees) at the approach end of Runway 35 at the Manchester-Boston Regional Airport, in the amount | $1.2M | approved | |
| 09/20/18 | #26 | Authorize the Bureau of Aeronautics to retroactively award a grant to the City of Manchester, to conduct an update to the Airport Master Plan Study at the Manchester-Boston Regional Airport, in the am | $210,026 | approved | |
| 09/20/18 | #27 | Authorize the Bureau of Aeronautics to award a grant to the Pease Development Authority, for Phase I to expand the airport terminal building to enable a more efficient movement of passengers through t | $1.7M | approved | |
| 09/20/18 | #28 | Authorize the Bureau of Aeronautics to amend a grant to provide additional funding to the City of Manchester (originally approved by G&C on 10-7-15, item #27), to acquire easements and remove obstruct | $471,288 | approved | |
| 09/20/18 | #29 | Authorize the Bureau of Construction to enter into a contract with Aulson Company LLC, Methuen, MA, for removal of lead-containing paint and maintenance repainting of two steel beam overpass bridges s | Aulson Company LLC | $1.7M | approved |
| 09/20/18 | #30 | Authorize the Bureau of Highway Design to enter into an agreement with the firm of McFarland-Johnson Inc., Concord, NH, for improvements to a five-mile section of NH Route 108 in the cities of Dover, | firm of McFarland-Johnson Inc. | $1.4M | approved |
| 09/20/18 | #30A | Authorize the Bureau of Aeronautics to accept a grant from the Federal Aviation Administration in the amount of $146,340 to provide funding to design the rehabilitation of a fuel spill area, Phase 1 f | $146,340 | approved | |
| 09/05/18 | #12 | Authorize the Bureau of Highway Design to enter into an Interstate Agreement with the State of Vermont to allow the Department to bill Vermont for costs associated with work to improve the pavement su | State of Vermont | approved | |
| 09/05/18 | #13 | Authorize to accept and place on file the Bureau of Right of Way’s Contemplated Award List for amounts less than $5,000 for the sum total of $29,766.07 for the period extending from April 1, 2018 thro | $29,766 | approved | |
| 09/05/18 | #14 | Authorize the Bureau of Right of Way’s request to pay property owners $67,100 as documented in the Contemplated Damage Awards List, for amounts greater than $5,000 for the period extending from July 1 | $67,100 | approved | |
| 09/05/18 | #15 | Authorize the Bureau of Bridge Design to enter into an agreement with Greenman-Pedersen Inc., Portsmouth, NH, for on-call engineering services for various bridge projects located throughout the State, | Greenman-Pedersen Inc. | $1.0M | approved |
| 09/05/18 | #16 | Authorize the Bureau of Bridge Design to enter into an agreement with HEB Engineers Inc., North Conway, NH, for on-call engineering services for various bridge projects located throughout the State, f | HEB Engineers Inc. | $1.0M | approved |
| 09/05/18 | #17 | Authorize the Bureau of Bridge Design to enter into an agreement with Stantec Consulting Services Inc., Auburn, NH, for the final design for the rehabilitation of the bridge carrying East Thetford Roa | Stantec Consulting Services In | $390,309 | approved |
| 09/05/18 | #18 | Authorize the Division of Operations Public Works Committee to accept as a gift to the State, and expend funds in the amount of $25,523 to cover expenditures for the Public Works Memorial. Effective u | $25,523 | approved | |
| 09/05/18 | #19 | Authorize the Bureau of Construction to enter into a contract with GMI Asphalt LLC, Belmont, NH, for permanent pavement repairs to damage due to October 29, 2017 storm event in the District 2 area, on | GMI Asphalt LLC | $570,402 | approved |
| 09/05/18 | #20 | Authorize the Bureau of Construction to enter into a contract with R. S. Audley Inc., Bow, NH, for bridge preservation efforts for the bridges carrying I-293 EB & WB over the Merrimack River, on the b | R. S. Audley Inc. | $4.6M | approved |
| 08/22/18 | #12 | Authorize the Bureau of Human Resources to retroactively pay Richard Drew, Highway Maintainer III, $1,655.13 for compensation due to missed increments from August 17, 2017 to June 21, 2018. 100% Highw | $1,655 | approved | |
| 08/22/18 | #13 | Authorize the Bureau of Human Resources to retroactively pay Gary LeBlanc, Assistant Highway Patrol Foreman, $2,217.60 for compensation due to missed increments from July 28, 2017 to June 21, 2018. 10 | $2,218 | approved | |
| 08/22/18 | #14 | Authorize the Bureau of Rail & Transit to pay the City of Nashua, NH, an amount not to exceed $275,000 to provide half of the funds required to match Federal Transit Administration grant funds for eli | $275,000 | approved | |
| 08/22/18 | #15 | Authorize the Bureau of Planning and Community Assistance to enter into Local Project Agreements (and their amendments) with municipalities and other eligible for State Bridge Aid. Effective upon G&C | approved | ||
| 08/22/18 | #16 | Authorize the Bureau of Finance and Contracts to enter into an agreement with Joseph Merritt & Co., Inc., Barnstead, NH, for a lease purchase for the HP Pagewide XL 5100 Wide Format Engineering Multi- | Joseph Merritt & Co., Inc. | $73,500 | approved |
| 08/22/18 | #17 | Authorize the Bureau of Highway Design to retroactively amend a contract with R&T Electric Inc., Concord, NH, to perform electrical work in conjunction with the rearrangement of office space in the Jo | R&T Electric Inc. | $17,509 | approved |
| 08/22/18 | #18 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for permanent pavement repairs to damage due to October 29, 2017 storm events in the District I ar | Pike Industries Inc. | $514,068 | approved |
| 08/22/18 | #19 | Authorize the Bureau of Transportation Systems Management & Operations to enter into a contract amendment with Southwest Research Institute, San Antonio, TX (originally approved by G&C on 5-23-14, ite | $6.6M | approved | |
| 08/22/18 | #20 | Authorize the Bureau of Construction to enter into a contract with Weaver Bros. Construction Co., Inc., Bow, NH, for widening NH 106 from 800’ south of Mudgett Hill Road to 1,400’ north of the NH Moto | Weaver Bros. Construction Co., | $2.6M | approved |
| 08/22/18 | #21 | Authorize the Bureau of Bridge Design to enter into an agreement with GM2 & Associates Inc., Concord, NH, for on-call engineering services for various bridge projects located throughout the State, for | GM2 & Associates Inc. | $1.0M | approved |
| 08/22/18 | #21A | Authorize the Bureau of Turnpikes to enter into a contract with Affinity LED Light LLC, Portsmouth, NH, for conversion of highway lighting from existing Mercury Vapor and High Pressure Sodium to Light | Affinity LED Light LLC | $36,504 | approved |
| 08/08/18 | #15 | Authorize to accept and place on file the Bureau of Environment’s annual accounting of permit fees and Aquatic Resource Mitigation Fund payments made during fiscal year 2018, to the Department of Envi | approved | ||
| 08/08/18 | #16 | Authorize the Bureau of Right of Way to pay property owners $2,239,700 as documented in the Contemplated Damage Awards List, for amounts greater than $5,000 for the period extending from June 14, 2018 | $2.2M | approved | |
| 08/08/18 | #17 | Authorize the Bureau of Right of Way to pay property owners $5,900 as documented in the Contemplated Damage Awards List for amounts greater than $5,000 for the period extending from June 29, 2018 thro | $5,900 | approved | |
| 08/08/18 | #18 | Authorize the Bureau of Right of Way to pay property owners $19,300 as documented in the Contemplated Damage Awards List for amounts greater than $5,000 for the period extending from July 11, 2018 thr | $19,300 | approved | |
| 08/08/18 | #19 | Authorize the Bureau of Right of Way to sell a 15 +/- acre parcel of State owned land improved with a single-family residence located in the Town of Troy to Billie Kirker for $125,000 plus a $1,100 ad | $125,000 | approved | |
| 08/08/18 | #20 | Authorize the Bureau of Right of Way to sell a 0.83 +/- acre parcel of State owned land improved with a single-family residence located in the Town of Troy to Adam Jenisch for $85,000 plus a $1,100 ad | $85,000 | approved | |
| 08/08/18 | #21 | Authorize the Bureau of Right of Way to sell a 2.6 +/- acre parcel of State owned land located on the easterly side of Main Street, adjacent to Lake Mascoma in the Town of Enfield to the Town of Enfie | $127,500 | approved | |
| 08/08/18 | #22 | Authorize the Bureau of Right of Way to sell a 3.3 +/- acre parcel of State owned land located on the easterly side of NH Route 25 in the Town of Wentworth to Granetta K Morse for $3,900 plus a $1,100 | $3,900 | approved | |
| 08/08/18 | #23 | Authorize the Bureau of Construction to enter into a contract amendment with R.S. Audley Inc., Bow, NH (originally approved by G&C on 2-21-18, item #16), for replacement of the Mill Street Bridge over | $1.3M | approved | |
| 08/08/18 | #24 | Authorize the Bureau of Construction to enter into a contract amendment with C.L.H. & Son Inc., Auburn, ME ( originally approved by G&C on 12-20-17, item #35), for the rock face stabilization work, by | $1.9M | approved | |
| 08/08/18 | #25 | Authorize the Bureau of Aeronautics to retroactively award a grant to the City of Manchester, in the amount of $10,214,879 to reconfigure Taxiways P and U as part of a Runway Incursion Mitigation Proj | $10.2M | approved | |
| 08/08/18 | #26 | Authorize the Bureau of Bridge Design to enter into an agreement with TranSystems Corporation, for the preliminary design, final design, public involvement process, and associated environmental & cult | TranSystems Corporation | $329,983 | approved |
| 08/08/18 | #27 | Authorize the Bureau of Rail & Transit to pay an amount not to exceed $832,500 to Advance Transit Inc., Wilder, VT, to procure two replacement 30-foot buses. Effective upon G&C approval through June 3 | $832,500 | approved |