Top Vendors
| Vendor | Items | Total |
|---|---|---|
| R.S. Audley Inc. | 3 | $59.6M |
| Pike Industries Inc. | 7 | $30.8M |
| Continental Paving Inc. | 3 | $12.0M |
| Brox Industries Inc. | 3 | $10.8M |
| ExeVision Inc. | 1 | $5.8M |
| AECOM Technical Services Inc. | 1 | $5.4M |
| GMI Asphalt LLC | 2 | $4.7M |
| C.W. Sliter & Sons LLC d/b/a CWS Fence & Guardrail Co. | 4 | $3.5M |
| Pathway Services Inc. | 2 | $3.1M |
| AssetWorks LLC | 1 | $2.9M |
| Eurovia Atlantic Coast LLC | 1 | $2.8M |
| Evroks Corporation | 2 | $2.7M |
| R.M. Piper Inc. | 2 | $2.3M |
| Southern Road & Bridge LLC | 1 | $1.9M |
| J Hutchins Inc. | 1 | $1.8M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 105 | $215.9M |
| other | 104 | $51.3M |
| transfer | 10 | $48.0M |
| grant | 6 | $14.9M |
| permit | 5 | $227,100 |
| lease | 4 | $170,524 |
| amendment | 4 | $17,625 |
| payment | 3 | $142,679 |
| settlement | 2 | $1.4M |
| personnel | 2 | $578,444 |
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 02/05/20 | #17 | Authorize the Bureau of Rail & Transit to pay the City of Nashua, NH, an amount not to exceed $69,566 to provide a portion of the non-Federal Funds required to match Federal Transit Administration ope | $69,566 | approved | |
| 02/05/20 | #18 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with the Tri-County Community Action Program, Berlin, NH (originally approved by G&C on 5-15-19, item #37K), to provide a port | $1.0M | approved | |
| 02/05/20 | #19 | Authorize the Bureau of Bridge Design to enter into an agreement with Becker Structural Engineers Inc., for the preliminary design, public involvement process, associated environmental & cultural serv | Becker Structural Engineers In | $302,900 | approved |
| 02/05/20 | #20 | Authorize the Bureau of Construction to enter into a contract with J Hutchins Inc., Richmond, VT, for 7.4 miles of pavement resurfacing in Colebrook and Stewartstown, on the basis of a low bid of $1,8 | J Hutchins Inc. | $1.8M | approved |
| 02/05/20 | #21 | Authorize to accept and place on file the Bureau of Construction’s year end summary report of active projects that may require contingency use, for 2019. | approved | ||
| 02/05/20 | #22 | Authorize the Bureau of Construction to enter into a contract with C.W. Sliter & Sons LLC d/b/a CWS Fence & Guardrail Co., Andover, NH, for guardrail replacement in Districts 4 and 5, on the basis of | C.W. Sliter & Sons LLC d/b/a C | $839,188 | approved |
| 02/05/20 | #23 | Authorize the Bureau of Construction to enter into a contract with GMI Asphalt LLC of Belmont, NH, for resurfacing various Tier 2 roadways in District 2 in Grafton and Sullivan Counties, on the basis | $2.1M | approved | |
| 01/22/20 | #20 | Authorize the Project Development Division to transfer $5,000,000 between various accounts and classes. Effective upon G&C approval through June 30, 2020. (2)Further authorize to accept and expend rev | $5.0M | approved | |
| 01/22/20 | #21 | Authorize, with the Department of Business and Economic Affairs, to enter into a memorandum of understanding for $2,269,040 for the management of Highway and Turnpike supported Safety Rest Areas/Welco | $2.3M | approved | |
| 01/22/20 | #22 | Authorize the Bureau of Right of Way to proceed with the sale of 4.67 +/- acres of state owned land on the Southerly side of NH Route 103 in the Town of Warner directly to the Town of Warner for $14,6 | $14,600 | approved | |
| 01/22/20 | #23 | Authorize the Bureau of Turnpikes to retroactively continue membership and participation with the International Bridge, Tunnel and Turnpike Association, Washington, DC, by paying annual membership due | $36,313 | approved | |
| 01/22/20 | #24 | Authorize the Bureau of Right of Way to pay a property owner $7,200 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from November 20, 2019 throug | $7,200 | approved | |
| 01/22/20 | #25 | Authorize the Bureau of Right of Way to pay property owners $20,180 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from December 17, 2019 throug | $20,180 | approved | |
| 01/22/20 | #26 | Authorize to accept and place on file the Bureau of Right of Way’s Contemplated Awards List for amounts less than $5,000 for the sum total of $54,260.29 for the period extending from October 1, 2019 t | $54,260 | approved | |
| 01/22/20 | #27 | Authorize the Bureau of Right of Way to pay a property owner $44,900 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from December 19, 2019 throu | $44,900 | approved | |
| 01/22/20 | #28 | Authorize the Bureau of Rail & Transit’s request for concurrence that a Public-Private Partnership approach is appropriate for the long term lease and management of the Portsmouth and Dover Bus Termin | approved | ||
| 01/22/20 | #29 | Authorize the Bureau of Turnpikes to continue membership and participation with the E-ZPass Interagency Group, New York, NY, by paying annual membership dues in the amount of $75,000 for Calendar Year | $75,000 | approved | |
| 01/22/20 | #30 | Authorize the Bureau of Turnpikes to retroactively accept and expend revenue in the amount of $17,400 from Geico Secure Insurance Company, for settlement of property damage claim for a Turnpike tracto | $17,400 | approved | |
| 01/22/20 | #31 | Authorize the Bureau of Turnpikes, Division of Operations to retroactively amend an existing professional service contract for the NH E-ZPass Back Office with Cubic Transportation Systems Inc. (origin | approved | ||
| 01/22/20 | #32 | Authorize the Bureau of Rail & Transit to enter into a retroactive contract with the NH Northcoast Corp., Ossipee, NH, for track improvements on its privately-owned short line railroad that runs betwe | NH Northcoast Corp. | approved | |
| 01/22/20 | #33 | Authorize the Bureau of Rail & Transit to enter into a contract with the St. Lawrence & Atlantic Railroad Company, Auburn, ME, for track improvements on its privately-owned short line railroad that ru | St. Lawrence & Atlantic Railro | $900,000 | approved |
| 01/22/20 | #34 | Authorize the Bureau of Rail & Transit to enter into transportation vehicle agreements with the sub-recipients as detailed in letter dated December 2, 2019. Effective upon G&C approval through the dat | approved | ||
| 01/22/20 | #35 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for incremental widening and overlay of I-93 to a four lane facility from Exit 1 in Salem to just | Pike Industries Inc. | $6.8M | approved |
| 01/22/20 | #36 | Authorize the Bureau of Construction to enter into a contract with Northeast Earth Mechanics Inc., Pittsfield, NH, for sidewalk curb ramp upgrades, on the basis of a low bid of $747,055. (2)Further au | Northeast Earth Mechanics Inc. | $747,055 | approved |
| 01/22/20 | #37 | Authorize the Bureau of Construction to enter into a contract with R.M. Piper Inc., Plymouth, NH, for bridge preservation of Br. No. 194-146, NH 28 over inactive NHRR in the Town of Ossipee, on the ba | R.M. Piper Inc. | $539,849 | approved |
| 01/22/20 | #38 | Authorize the Bureau of Transportation Systems Management & Operations to enter into a contract amendment with Southwest Research Institute, San Antonio, TX (originally approved by G&C on 5-23-14, ite | $7.4M | approved | |
| 01/22/20 | #39 | Authorize the Bureau of Aeronautics to provide funding to the Franconia Soaring Foundation, owner of the Franconia Airport, to provide maintenance and restoration to the turf airfield surfaces, in the | $12,684 | approved | |
| 01/22/20 | #40 | Authorize the Bureau of Materials & Research to enter into an agreement with Terracon Consultants Inc., Manchester, NH, for the purposes of providing materials testing and construction inspection serv | Terracon Consultants Inc. | $300,000 | approved |
| 01/22/20 | #41 | Authorize the Bureau of Materials & Research to enter into a sole source retroactive agreement with the NorthEast Transportation Training & Certification Program Inc., Marshfield, MA, to participate i | NorthEast Transportation Train | $65,000 | approved |
| 01/08/20 | #7 | Authorize the Division of Operations to transfer $468,750 between various classes. Effective upon G&C approval through June 30, 2021. Fiscal Committee approved. | $468,750 | approved | |
| 01/08/20 | #8 | Authorize the Division of Project Development to accept and expend revenue in the amount of $300 from increased administrative overhead. Effective upon G&C approval through June 30, 2020. 100% Agency | $300 | approved | |
| 01/08/20 | #9 | Authorize the Bureau of Environment to make payments to the Department of Environmental Services for permit-related fees pursuant to the Shoreland Water Quality Protection Act, for DOT construction pr | approved | ||
| 01/08/20 | #10 | Authorize the Bureau of Rail & Transit to sell a 2.55 acre parcel of State-owned land located on the Northern Railroad Corridor in the Town of Andover to John & Hilde Heaton for $35,000 and the one-ti | $35,000 | approved | |
| 01/08/20 | #11 | Authorize the Bureau of Rail & Transit to enter into a memorandum of agreement with the New England Central Railroad Inc., Rochester, NY, to assign bridge maintenance and inspection responsibilities o | New England Central Railroad I | approved | |
| 01/08/20 | #12 | Authorize the Bureau of Materials & Research to enter into an agreement with John Turner Consulting Inc., North Hampton, NH, for the purpose of providing materials testing and construction inspection | John Turner Consulting Inc. | $400,000 | approved |
| 01/08/20 | #13 | Authorize the Bureau of Bridge Design to enter into an agreement with Hoyle, Tanner & Associates Inc., for the preliminary design, public involvement process, and associated environmental & cultural s | $569,949 | approved | |
| 01/08/20 | #14 | Authorize the Bureau of Aeronautics to provide retroactive funding to the Nashua Airport Authority in Nashua, NH, for the design and bidding for airport pavement maintenance, rehabilitation, and marki | $199,500 | approved | |
| 01/08/20 | #15 | Authorize the Bureau of Construction to enter into a contract with Eurovia Atlantic Coast LLC, Charlotte, NC, for resurfacing of five sections of Tier 2 roadways in District 4, on the basis of a low b | Eurovia Atlantic Coast LLC | $2.8M | approved |
| 01/08/20 | #16 | Authorize to enter into an agreement with AssetWorks LLC, Wayne, PA, for the procurement of SaaS services to provide and install a Work Order, Fleet and Inventory System, for an amount not to exceed $ | AssetWorks LLC | $2.9M | approved |
| 01/08/20 | #17 | Authorize the Bureau of Transportation Systems Management & Operations to enter into a contract amendment with Tilson Technology Management Inc., Portland, ME (originally approved by G&C on 3-22-17, i | $4.6M | approved | |
| 01/08/20 | #18 | Authorize the Bureau of Construction to enter into a contract with W J Riegel Rail Solutions LLC, Selkirk, NY, for railroad safety improvements on NH Rt. 16 in Wakefield, on the basis of a low bid of | W J Riegel Rail Solutions LLC | $939,774 | approved |
| 01/08/20 | #19 | Authorize the Bureau of Construction to enter into a contract with Monoko LLC, Tarpon Springs, FL, for bridge painting of six steel beam bridges along I-93 in Sanbornton and New Hampton, on the basis | Monoko LLC | $1.1M | approved |
| 01/08/20 | #20 | Authorize the Bureau of Aeronautics to provide funding to the Town of Plymouth, owner of the Plymouth Municipal Airport, to remove obstructions, clear, grub and seed approximately 0.5 acres north of R | $6,640 | approved | |
| 01/08/20 | #21 | Authorize the Bureau of Turnpikes to enter into a contract with Travelers Marketing LLC, Wellesley, MA, for sponsorship of the Bureau of Turnpikes Motor Safety Patrol along the Blue Star, the Central | Travelers Marketing LLC | $260,000 | approved |
| 01/08/20 | #22 | Authorize the Bureau of Highway Design to retroactively amend a contract with Vanasse Hangen Brustlin Inc. (originally approved by G&C on 10-7-15, item #29), to perform the second phase of a turnpike | approved |
← Previous