Top Vendors
| Vendor | Items | Total |
|---|---|---|
| Pike Industries Inc. | 117 | $502.2M |
| R.S. Audley Inc. | 30 | $429.4M |
| Continental Paving Inc. | 83 | $373.5M |
| Cubic Transportation Systems Inc. | 3 | $337.0M |
| State of Maine | 4 | $213.0M |
| state of Maine | 1 | $176.7M |
| Xerox State and Local Solution | 2 | $140.2M |
| SPS New England Inc. | 3 | $115.1M |
| Alvin J. Coleman & Son Inc. | 19 | $107.8M |
| Weaver Brothers Construction Company Inc. | 5 | $96.5M |
| Brox Industries Inc. | 23 | $89.1M |
| Archer Western Contractors LLC | 1 | $83.9M |
| Reed & Reed General Contractors | 2 | $78.2M |
| Severino Trucking Co Inc. | 1 | $67.1M |
| E.D. Swett Inc. | 12 | $67.1M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 1,569 | $4.21B |
| other | 1,466 | $3.45B |
| grant | 215 | $290.6M |
| transfer | 173 | $311.3M |
| nomination | 111 | $109.2M |
| amendment | 106 | $331.5M |
| lease | 102 | $25.2M |
| payment | 39 | $1.4M |
| permit | 38 | $10.7M |
| personnel | 15 | $100.3M |
| report | 10 | $5.7M |
| settlement | 4 | $5.0M |
| waiver | 1 | $250,000 |
Spending by Year
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 02/21/24 | #42 | Authorize to accept and place on file the Bureau of Right-of-Way’s Contemplated Awards List for amount less than $5,000, for a total of 38,876.24 for the period extending from October 1, 2023 through | $5,000 | approved | |
| 02/21/24 | #43 | Authorize the Bureau of Turnpikes to transfer funds in the amount of $143,905 from the Turnpike’s General Reserve Account to budget and expend revenue for Armored Car Services at Turnpike’s Toll Plaza | Loomis Armored US, LLC | $349,667 | approved |
| 02/21/24 | #44 | Authorize the Bureau of Bridge Maintenance to enter into a contract on a single bid with Accredited Safety Solutions, Inc., Avon, IN, in the amount of $78,613 to provide all labor, materials, equipmen | $78,613 | approved | |
| 02/21/24 | #45 | Authorize the Bureau of Materials & Research to enter into an agreement with R.W. Gillespie & Associates, Inc., Biddeford, ME, for total fees not to exceed $600,000 for the purposes of providing mater | R.W. Gillespie & Associates, I | $600,000 | approved |
| 02/21/24 | #46 | Authorize the Bureau of Bridge Design to enter into an agreement with HRV Conformance verification Associates, Inc., Moon Township, PA, for an amount not to exceed $600,000, to provide on-call structu | HRV Conformance verification A | $600,000 | approved |
| 02/21/24 | #47 | Authorize the Bureau of Bridge Design to enter into an agreement with KTA-Tator, Inc., Pittsburgh, PA, for an amount not to exceed $600,000, to provide on-call structural steel inspection services for | KTA-Tator, Inc. | $600,000 | approved |
| 02/21/24 | #48 | Authorize the Bureau of Bridge Design to enter into an agreement with TRC Engineers, LLC, Allenstown, PA, for an amount not to exceed $600,000, to provide on-call structural steel inspection services | TRC Engineers, LLC | $600,000 | approved |
| 02/21/24 | #48A | Authorize the Bureau of Turnpikes to retroactively continue its membership and participation with the E-ZPass Interagency Group, New York, NY by paying annual membership dues in the amount of $50,000 | $50,000 | approved | |
| 02/21/24 | #48B | Authorize the Human Resources to enter into a sole source agreement with the Federal Highway Administration Finance Division, National Highway Institute, Arlington, VA, for an amount not to exceed $25 | Federal Highway Administration | $255,875 | approved |
| 02/21/24 | #49 | Authorize the Bureau of Construction to enter into a contract with J Hutchins Inc., Richmond, VT, on the basis of a low bid of $2,993,930 for resurfacing of two sections of US 3 within the Towns of Co | J Hutchins Inc. | $3.0M | approved |
| 01/31/24 | #H | Authorize the Bureau of Right-of-Way’s petition for a hearing on the reconstruction of NH Route 28, Main Street, and Depot Road in the Town of Chichester, NH. The Main Street approaches will be consol | $971 | ||
| 01/31/24 | #32 | Authorize the Bureau of Aeronautics to accept and expend grant revenue in the amount of $45,700 in FY24 from the Federal Aviation Administration to cover eligible administrative costs. Effective upon | $45,700 | approved | |
| 01/31/24 | #33 | Authorize the Bureau of Planning & Community Assistance to accept and place on file the status report of all active and federally funded locally administered projects. | approved | ||
| 01/31/24 | #34 | Authorize the Bureau of Right-of-Way to pay property owners, tenants, and/or claimants $124,814 as documented in the Contemplated Awards list, for amounts greater than $5,000 for the period extending | $124,814 | approved | |
| 01/31/24 | #35 | Authorize the Bureau of Finance & Contracts to accept and place on file the paid Small Claims in Fiscal Year 2023 totaling $13,908.98 for individuals amounts less than $2,000 submitted under the provi | $13,909 | approved | |
| 01/31/24 | #36 | Authorize the Bureau of Mechanical Services to enter into a contract with Cintas, Manchester, NH, on the basis of a low bid offer of $43,605.96 for providing Uniform Rental and Laundry Services for ou | Cintas | $43,606 | approved |
| 01/31/24 | #37 | Authorize the Bureau of Materials & Research to enter into an agreement with John Turner Consulting, Inc., North Hampton, NH, for total fees not to exceed $400,000 for the purpose of providing materia | John Turner Consulting, Inc. | $400,000 | approved |
| 01/31/24 | #38 | Authorize the Bureau of Highway Maintenance to enter into a purchase agreement with United Construction & Forestry, Pembroke, NH, on the basis of a sole source price of $4,823,024.55 for sixty-six 201 | United Construction & Forestry | $4.8M | approved |
| 01/31/24 | #39 | Authorize the Bureau of Construction to enter into a contract with Continental Paving, Inc., Londonderry, NH, on the basis of a low bid of $5,907,585.85 for roadway resurfacing on US 3/NH 28 Bypass in | Continental Paving, Inc. | $5.9M | approved |
| 01/31/24 | #40 | Authorize the Bureau of Construction to enter into a contract with C.W. Sliter & Sons, LLC d/b/a CWS Fence & Guardrail Co., Andover, NH, on the basis of a low bid of $772,240 for replacement and upgra | C.W. Sliter & Sons, LLC d/b/a | $772,240 | approved |
| 01/31/24 | #41 | Authorize the Bureau of Construction to enter into a contract with Pike Industries, Inc., Belmont, NH, on the basis of a low bid of $2,853,083.42 for roadway resurfacing on the Spaulding Turnpike (NH | Pike Industries, Inc. | $2.9M | approved |
| 01/31/24 | #42 | Authorize the Bureau of Construction to enter into a contract with Continental Paving, Inc., Londonderry, NH, on the basis of a single bid of $10,011,909.25 for roadway resurfacing of two sections of | Continental Paving, Inc. | $10.0M | approved |
| 01/31/24 | #43 | Authorize the Bureau of Construction to enter into a contract with Pike Industries, Inc., Belmont, NH, on the basis of a low bid of $11,316,500.76 for roadway resurfacing on I-93 in Plymouth, Campton | Pike Industries, Inc. | $11.3M | approved |
| 01/31/24 | #44 | Authorize the Bureau of Right-of-Way to amend an Item approved on April 17, 2019, Item #44A for the addition of NH Real Estate Consultants, Andover, NH to prepare appraisals for property needed for tr | approved | ||
| 01/31/24 | #45 | Authorize the Bureau of Highway Design to retroactively amend a contract with McFarland-Johnson, Inc., Concord, NH (originally approved by G&C on 9/30/18, Item #30), for improvements to a five-mile se | McFarland-Johnson, Inc. | approved | |
| 01/10/24 | #A | Authorize the Bureau of Materials & Research to amend a sole source Cooperative Project Agreement with the University of New Hampshire Sponsored Programs Administration, Durham, NH (originally approve | University of New Hampshire Sp | ||
| 01/10/24 | #C | Authorize the Bureau of Aeronautics to enter into a Memorandum of Agreement with the Federal Aviation Administration (FAA) Headquarters, Washington, DC, that ensures the Department is in compliance wi | Federal Aviation Administratio | ||
| 01/10/24 | #20 | Authorize the Executive Office to retroactively pay membership dues to the Intelligent Transportation Society of America (ITS America), Washington, DC, in the amount of $10,000, for membership in the | $10,000 | approved | |
| 01/10/24 | #21 | Authorize the Bureau of Finance & Contracts to retroactively pay memberships dues to the American Association of State Highway and Transportation Officials, Washington, DC, in the amount of $34,000, f | $34,000 | approved | |
| 01/10/24 | #22 | Authorize the Bureau of Right-of-Way to sell 2,410 square feet of state-owned land on the westerly side of Shadow Lake Road in the Town of Salem, NH. The sale will be direct to Sfeir Realty, LLC, for | $37,100 | approved | |
| 01/10/24 | #23 | Authorize the Bureau of Planning & Community Assistance to enter into an agreement totaling $734,417 with the Town of Enfield, NH to provide funding and services under the Federal Scenic Byways Progra | $734,417 | approved | |
| 01/10/24 | #24 | Authorize the Bureau of Construction to retroactively increase the contract value amount with Pine Ridge Technologies, Inc., No. Reading, MA, by $15,000 from $219,216 to $234,216 for signal upgrades, | $234,216 | approved | |
| 01/10/24 | #25 | Authorize the Bureau of Construction to enter into a contract with Pike Industries, Inc., Belmont, NH on the basis of a low bid of $4,972,866.69 for roadway resurfacing on I-93 northbound and southbou | Pike Industries, Inc. | $5.0M | approved |
| 01/10/24 | #25A | Authorize the Bureau of Construction to retroactively pay the invoice to American Association of State Highway and Transportation Officials, Washington, DC, in the amount of $9,375, for HaulHub electr | $9,375 | approved | |
| 01/10/24 | #25B | Authorize the Bureau of Right-of-Way to sell 1.18+/- acres of state-owned land located on the westerly side of NH Route 3 and north of Merrill Access Road in the Town of Thornton, NH. The sale will be | $8,000 | approved | |
| 01/10/24 | #25C | Authorize the Bureau of Aeronautics to award a grant to the Pease Development Authority, in the amount of $7,184,210.53, to construct an expansion of the terminal building at the Portsmouth Internatio | $7.2M | approved | |
| 12/20/23 | #B | Authorize to enter into a contract amendment with the Milford-Bennington Railroad Company, Inc., Milford, NH (originally approved by G&C on 9/3/14, Item #17), to amend the completion date from Decembe | |||
| 12/20/23 | #C | Authorize to amend a contract with HDR Engineering, Inc., Manchester, NH (originally approved by G&C on 8/26/20, Item #27), for preliminary design of improvements to NH Route 120 in Lebanon, NH by ext | HDR Engineering, Inc. | ||
| 12/20/23 | #34 | Authorize the Bureau of Operations to continue its membership and participation with the Eastern Transportation Coalition, University of Maryland, College Park, MD by retroactively paying annual membe | $80,000 | approved | |
| 12/20/23 | #35 | Authorize the Bureau of Construction to hold an organized meeting from January 23-26, 2024, at the NH Department of Transportation John O. Morton Building large conference room in Concord, NH, for a t | $3,800 | approved | |
| 12/20/23 | #36 | Authorize the Commissioner’s Office to increase the salary of Michelle Winters, Director of Aeronautics, Rail and Transit, to establish $1,000 differential above a subordinate classified employee, at | $119,851 | approved | |
| 12/20/23 | #37 | Authorize the Bureau of Highway Maintenance to retroactively pay Alta Construction Equipment d/b/a Ambrose Equipment Inc., Hooksett, NH, in the amount of $5,760.73 for repair work performed on a State | $5,761 | approved | |
| 12/20/23 | #38 | Authorize the Bureau of Highway Maintenance to retroactively pay MB Tractor & Equipment, Plaistow, NH, in the amount of $332.35, for repair work performed on Kubota 4800 tractor. Effective upon G&C ap | $332 | approved | |
| 12/20/23 | #39 | Authorize the Bureau of Turnpikes to enter into a retroactive sole source invoice payment with Robert Pike Construction, Salisbury, MA for emergency repairs in the amount of $11,197.34 for locating an | $11,197 | approved | |
| 12/20/23 | #40 | Authorize the Bureau of Highway Maintenance to retroactively pay United Construction & Forestry, Pembroke, NH, in the amount of $4,420.05, for repair work performed on John Deere 310 SL loader-backhoe | $4,420 | approved | |
| 12/20/23 | #41 | Authorize the Bureau of Right-of-Way to pay a property owner $6,000 as documented in the Contemplated Damage Awards list, for amounts greater than $5,000 for the period extending from October 14, 2023 | $6,000 | approved | |
| 12/20/23 | #42 | Authorize the Bureau of Right-of-Way to pay property owners, tenants, and/or claimants $22,000 as documented in the Contemplated Awards list, for amounts greater than $5,000 for the period extending f | $22,000 | approved | |
| 12/20/23 | #43 | Authorize the Bureau of Right-of-Way to pay property owners, tenants, and/or claimants $163,693.49 as documented in the Contemplated Awards list, for amounts greater than $5,000 for the period extendi | $163,693 | approved | |
| 12/20/23 | #44 | Authorize the Bureau of Aeronautics to provide funding to the City of Keene, NH in the amount of $11,045, to prepare an Environmental Assessment and Preliminary Wildlife/Perimeter Fence Design at the | $11,045 | approved | |
| 12/20/23 | #45 | Authorize the Office of Access, Opportunity and Compliance to enter into a contract with Turner Surety and Insurance Brokerage, Inc., Saddle Brook, NJ, based on a single bid, for a total fee of $24,52 | Turner Surety and Insurance Br | $24,523 | approved |