Top Vendors
| Vendor | Items | Total |
|---|---|---|
| Pike Industries Inc. | 117 | $502.2M |
| R.S. Audley Inc. | 31 | $444.9M |
| Continental Paving Inc. | 85 | $379.7M |
| Cubic Transportation Systems Inc. | 3 | $337.0M |
| State of Maine | 4 | $213.0M |
| state of Maine | 1 | $176.7M |
| Xerox State and Local Solution | 2 | $140.2M |
| SPS New England Inc. | 3 | $115.1M |
| Alvin J. Coleman & Son Inc. | 19 | $107.8M |
| Weaver Brothers Construction Company Inc. | 5 | $96.5M |
| Brox Industries Inc. | 23 | $89.1M |
| Archer Western Contractors LLC | 1 | $83.9M |
| Reed & Reed General Contractors | 2 | $78.2M |
| Severino Trucking Co Inc. | 1 | $67.1M |
| E.D. Swett Inc. | 12 | $67.1M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 1,587 | $4.26B |
| other | 1,473 | $3.45B |
| grant | 216 | $290.7M |
| transfer | 176 | $319.7M |
| nomination | 117 | $109.2M |
| lease | 109 | $25.7M |
| amendment | 108 | $331.5M |
| payment | 39 | $1.4M |
| permit | 38 | $10.7M |
| personnel | 15 | $100.3M |
| report | 12 | $5.7M |
| settlement | 4 | $5.0M |
| expenditure | 2 | $46,329 |
| waiver | 1 | $250,000 |
Spending by Year
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 09/04/13 | #104 | Authorize the Bureau of Aeronautics to provide funding to the Pease Development Authority, for SBG-16-02-0213, Phase 1 efforts to restore airfield pavement and drainage systems that have been damaged | $2.0M | approved | |
| 09/04/13 | #105 | Authorize the Bureau of Aeronautics to provide funding to the Pease Development Authority for SBG-16-01-0213 to conduct a facility needs analysis at the Portsmouth International Airport at Pease, in t | $73,625 | approved | |
| 09/04/13 | #106 | Authorize the Bureau of Aeronautics to provide funding to the City of Keene, NH, for SBG-08-11-2013, to conduct an environmental assessment of obstructions to the Runway 20 approach surfaces at the Di | $145,350 | approved | |
| 09/04/13 | #107 | Authorize the Bureau of Construction to enter into a contract with R.M. Piper Inc., Plymouth, NH, for slope stabilization on NH Route 10 in Haverhill, on the basis of a low bid of $1,109,102.75. (2)Fu | R.M. Piper Inc. | $1.1M | approved |
| 09/04/13 | #108 | Authorize the Bureau of Construction to enter into a retroactive contract with R.S. Audley Inc., Bow, NH, for emergency roadway repair on NH 12A (Alstead Center Road) approximately 700 feet north of t | R.S. Audley Inc. | $1.8M | approved |
| 09/04/13 | #109 | Authorize the Bureau of Construction to enter into a contract with Surface Preparation Technologies LLC, Mechanicsburg, PA, for milling rumble strips in the shoulders and along the centerlines at vari | Surface Preparation Technologi | $201,310 | approved |
| 09/04/13 | #110 | Authorize the Bureau of Construction to enter into a contract with Delucca Fence Company Inc., Belmont, NH, for replacement of approximately 100 terminal “F” guardrail end units at various locations, | Delucca Fence Company Inc. | $863,998 | approved |
| 09/04/13 | #111 | Authorize the Bureau of Aeronautics to award a grant to the City of Berlin to construct the replacement Jet-A fuel farm at the Berlin Regional Airport, in the amount of $329,175. Effective upon G&C ap | $329,175 | approved | |
| 08/14/13 | #87 | Authorize the Bureau of Right of Way to pay various owners $57,150 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from July 4, 2013 through July | $57,150 | approved | |
| 08/14/13 | #88 | Authorize the Bureau of Right of Way to sell a 20+/- acre parcel of State owned land located on the northerly side of NH Route 10 in the Town of Piermont to Yaroslav Frimerman and Elena Selioukova for | $7,700 | approved | |
| 08/14/13 | #89 | Authorize the Bureau of Highway Maintenance, Well Section, to enter into a contract with Wragg Brothers of Vermont Inc., Ascutney, VT, for a 6-inch drilled well and pump on the property of Steve Gagno | Wragg Brothers of Vermont Inc. | $23,000 | approved |
| 08/14/13 | #90 | Authorize the Bureau of Highway Design to amend an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, (originally approved by G&C on 3-7-12, item #84), to perform a system planning study to exa | Vanasse Hangen Brustlin Inc. | approved | |
| 08/14/13 | #91 | Authorize the Bureau of Materials & Research to enter into an agreement with Terracon Consultants Inc., Manchester, NH, for the purpose of providing on-call Statewide Bridge Deck Condition Surveys, fo | Terracon Consultants Inc. | $250,000 | approved |
| 08/14/13 | #92 | Authorize the Bureau of Mechanical Services to enter into a contract with North American Equipment Upfitters Inc., Hooksett, NH, for providing Aerial Lift Inspection repair, scheduled service and unsc | North American Equipment Upfit | $123,580 | approved |
| 08/14/13 | #93 | Authorize to accept and place on file the Bureau of Construction’s quarterly basis summary of active projects that may require contingency use, for the period through June 30, 2013. | approved | ||
| 08/14/13 | #94 | Authorize the Bureau of Traffic to enter into an agreement with Vanasse Hangen Brustlin Inc., Bedford, NH, and Watertown, NY, to develop and implement optimized traffic signal timing plans for approxi | Vanasse Hangen Brustlin Inc. | $264,839 | approved |
| 08/14/13 | #95 | Authorize the Bureau of Construction to enter into a contract with Continental Industries Inc., Londonderry, NH, for pavement rehabilitation on 13.6 miles of NH 9 east of Granite Lake Road in the Town | Continental Industries Inc. | $4.2M | approved |
| 08/14/13 | #96 | Authorize the Bureau of Construction to enter into a contract with L.A. Drew Inc., Intervale, NH, for safety improvements at the intersection of NH Route 25 and Fox Hollow Road in Moultonborough, on t | L.A. Drew Inc. | $498,345 | approved |
| 08/14/13 | #97 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for pavement rehabilitation along 2.6 miles of NH Route 9 in Keene/Roxbury and 0.3 miles of NH Rou | Pike Industries Inc. | $2.8M | approved |
| 08/14/13 | #98 | Authorize for an appropriation to be established in the amount of $150,000 to be utilized for the repairs to State owned and maintained stream bed drainage culvert systems in the Towns of Westmoreland | $150,000 | approved | |
| 07/24/13 | #71 | Authorize to accept and place on file the Bureau of Finance and Contracts’ report of all Small Claims in the previous fourth quarter of FY 2013 totaling $2,290.87 for individual amounts less than $600 | $2,291 | approved | |
| 07/24/13 | #72 | Authorize the Bureau of Right of Way’s petition for a hearing on the bridge replacement in the Town of Farmington, and to appoint a commission to hold a hearing, and if the necessity is found, to layo | $939 | approved | |
| 07/24/13 | #73 | Authorize to accept and place on file the Bureau of Right of Way’s Contemplated Awards List for amounts less than $5,000 for the sum total of $48,879.80 for the period extending from April 1, 2013 thr | $48,880 | approved | |
| 07/24/13 | #74 | Authorize the Bureau of Right of Way to pay various owners $141,000 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from June 19, 2013 through Ju | $141,000 | approved | |
| 07/24/13 | #75 | Authorize the Bureau of Right of Way to transfer a 43.82 acre parcel of land, more or less, located in the Town of Plaistow, to the Town of Plaistow retaining an “Executory Interest” to the NH Departm | approved | ||
| 07/24/13 | #76 | Authorize the Bureau of Planning and Community Assistance to enter into an agreement with the Town of Newport to provide funding and services under the Municipal-Owned Bridge Rehabilitation & Replacem | Town of Newport | $1.1M | approved |
| 07/24/13 | #77 | Authorize the Bureau of Planning and Community Assistance to enter into an agreement with the Hampton School District, SAU 90 (sub-recipient) to provide funding and services for a travel plan at Centr | $33,900 | approved | |
| 07/24/13 | #78 | Authorize the Bureau of Planning and Community Assistance to enter into an agreement with the City of Laconia, to provide funding and services under the Municipal-Owned Bridge Rehabilitation & Replace | City of Laconia | $2.9M | approved |
| 07/24/13 | #79 | Authorize the Bureau of Mechanical Services to enter into a contract with North American Equipment Upfitters Inc., Hooksett, NH, for providing Truck Crane Inspection, repair, scheduled service and uns | North American Equipment Upfit | $123,920 | approved |
| 07/24/13 | #80 | Authorize the Bureau of Turnpikes to enter into a contract with Pro Controls Inc., Bow, NH, for HVAC Conditioning, Energy Management and Control System Service, in the amount of $65,600. Effective upo | Pro Controls Inc. | $65,600 | approved |
| 07/24/13 | #81 | Authorize the Bureau of Construction to enter into a contract with CW Sliter & Sons Inc., d/b/a CWS Fence & Guardrail, Andover, NH, for replacing substandard guardrail along approximately 12 miles of | CW Sliter & Sons Inc., d/b/a C | $984,703 | approved |
| 07/24/13 | #82 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for roadway rehabilitation on 6.7 miles of I-93 in Littleton from Exit 42 north to the Vermont bor | Pike Industries Inc. | $16.2M | approved |
| 07/24/13 | #83 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for pavement rehabilitation on NH Route 126 to the north of John Tasker Road in Barnstead, on the | Pike Industries Inc. | $294,540 | approved |
| 07/24/13 | #84 | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for pavement rehabilitation along 4.1 miles of NH Route 125 to the south of US 4 (Traffic C | Continental Paving Inc. | $1.3M | approved |
| 07/10/13 | #104 | Authorize the Bureau of Right of Way to pay various owners $144,555 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from May 29, 2013 through Jun | $144,555 | approved | |
| 07/10/13 | #105 | Authorize the Bureau of Right of Way to sell a 5+/- acre parcel of State owned land located in the Town of Exeter to Edward J. Corner or assigns for $11,100 which includes an Administrative Fee of $1, | $11,100 | approved | |
| 07/10/13 | #106 | Authorize the Bureau of Right of Way to sell a 1.76+/- acre parcel of State owned land located on the easterly side of US Route 3 in the Town of Bedford to Sentinel Acquisition Corp for $325,000 plus | $325,000 | approved | |
| 07/10/13 | #107 | Authorize the Bureau of Aeronautics to amend a grant to provide additional funding to the City of Manchester, for AIP-87, to acquire an Interactive Employee-Training Module and to provide airport pers | $3,502 | approved | |
| 07/10/13 | #108 | Authorize the Bureau of Aeronautics to enter into a contract with Anvab Inc., (d/b/a Concord Aviation Services), Concord, NH, for rental of aircraft, in an amount not to exceed $16,000. Effective upon | Anvab Inc., (d/b/a Concord Avi | $16,000 | approved |
| 07/10/13 | #109 | Authorize the Bureau of Environment to pay the Department of Environmental Services Aquatic Resource Mitigation Fund $923,756.21 as documented in the wetlands impact approval notices. Effective upon G | $923,756 | approved | |
| 07/10/13 | #110 | Authorize the Bureau of Mechanical Services to enter into a retroactive contract with Unifirst Corporation, Lebanon, NH, for providing uniforms to certain employees for the Bureau of Mechanical Servic | Unifirst Corporation | $21,507 | approved |
| 07/10/13 | #111 | Authorize the Bureau of Materials & Research to enter into a sole source Joint Funding Agreement with the US Geological Survey, Pembroke, NH, for a cooperative investigation on determining sources of | US Geological Survey | $70,000 | approved |
| 07/10/13 | #112 | Authorize the Bureau of Turnpikes to enter into a contract with Eckhardt & Johnson Inc., Manchester, NH, for Annual Boiler & HVAC Maintenance, in the amount of $69,312. Effective upon G&C approval thr | Eckhardt & Johnson Inc. | $69,312 | approved |
| 07/10/13 | #113 | Authorize the Bureau of Turnpikes to enter into a contract with CW Sliter & Sons Inc., d/b/a CWS Fence & Guardrail, Andover, NH, for the repair of damaged beam guardrail and fencing on the Central and | CW Sliter & Sons Inc., d/b/a C | $163,585 | approved |
| 07/10/13 | #114 | Authorize the Bureau of Rail & Transit to enter into an agreement with Connecticut River Transit Inc., Rockingham, VT, to support transportation services connecting Hinsdale, NH to Brattleboro, VT, fo | Connecticut River Transit Inc. | $33,250 | approved |
| 07/10/13 | #115 | Authorize the Bureau of Highway Design to enter into an agreement with McFarland-Johnson Inc., Concord, NH, and Binghamton, NY, to prepare the second phase of the preliminary engineering design for th | McFarland-Johnson Inc. | $408,924 | approved |
| 07/10/13 | #116 | Authorize the Bureau of Highway Design to enter into an agreement with The Louis Berger Group Inc., Manchester, NH, and Morristown, NJ, for on-call engineering services primarily for, but not limited | Louis Berger Group Inc. | $750,000 | approved |
| 07/10/13 | #117 | Authorize the Bureau of Materials and Research to enter into a contract with Northern Test Boring Inc., Gorham, ME, for the purpose of providing on-call Statewide Geotechnical Subsurface Explorations | Northern Test Boring Inc. | $300,000 | approved |
| 07/10/13 | #118 | Authorize the Bureau of Environment to enter into an agreement with (1)Stoney Ridge Environmental LLC, Alton, NH, for $125,000; (2)Gove Environmental Services Inc., Exeter, NH, for $100,000; and (3)FB | (1)Stoney Ridge Environmental | $125,000 | approved |
| 07/10/13 | #119 | Authorize the Bureau of Bridge Design to enter into an agreement with GM2 Associates Inc., Concord, NH, for the preliminary design for the replacement of the Red List bridge carrying US Route 4 over B | GM2 Associates Inc. | $464,496 | approved |