Top Vendors
| Vendor | Items | Total |
|---|---|---|
| R.S. Audley Inc. | 3 | $59.6M |
| Pike Industries Inc. | 7 | $30.8M |
| Continental Paving Inc. | 3 | $12.0M |
| Brox Industries Inc. | 3 | $10.8M |
| ExeVision Inc. | 1 | $5.8M |
| AECOM Technical Services Inc. | 1 | $5.4M |
| GMI Asphalt LLC | 2 | $4.7M |
| C.W. Sliter & Sons LLC d/b/a CWS Fence & Guardrail Co. | 4 | $3.5M |
| Pathway Services Inc. | 2 | $3.1M |
| AssetWorks LLC | 1 | $2.9M |
| Eurovia Atlantic Coast LLC | 1 | $2.8M |
| Evroks Corporation | 2 | $2.7M |
| R.M. Piper Inc. | 2 | $2.3M |
| Southern Road & Bridge LLC | 1 | $1.9M |
| J Hutchins Inc. | 1 | $1.8M |
Item Types
| Type | Count | Total Value |
|---|---|---|
| contract | 105 | $215.9M |
| other | 104 | $51.3M |
| transfer | 10 | $48.0M |
| grant | 6 | $14.9M |
| permit | 5 | $227,100 |
| lease | 4 | $170,524 |
| amendment | 4 | $17,625 |
| payment | 3 | $142,679 |
| settlement | 2 | $1.4M |
| personnel | 2 | $578,444 |
Items
| Date | Item | Description | Vendor | Amount | Outcome |
|---|---|---|---|---|---|
| 05/06/20 | #62 | Authorize the Bureau of Materials & Research to enter into a contract with Pathway Services Inc., Tulsa, OK, to provide road condition data collection, data storage, and web hosting services in suppor | Pathway Services Inc. | $3.1M | approved |
| 04/08/20 | #18 | Authorize the Bureau of Right of Way to pay property owners $2,670,938.94 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from March 2, 2020 thro | $2.7M | approved | |
| 04/08/20 | #19 | Authorize the Bureau of Planning & Community Assistance to amend the existing agreement with the Vermont Agency of Transportation, Montpelier, VT (originally approved by G&C on 2-21-18, item #20), to | Vermont Agency of Transportati | approved | |
| 04/08/20 | #20 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for approximately 25 miles of pavement resurfacing and repair along NH 101 between Epping and Exet | Pike Industries Inc. | $7.0M | approved |
| 04/08/20 | #21 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with the New England Central Railroad Inc., Rochester, NY (originally approved by G&C on 12-9-09, item #161), for the use of t | approved | ||
| 04/08/20 | #22 | Authorize the Bureau of Rail & Transit to amend a lease of a 65,100 square foot parcel of state-owned land located on the Northern Railroad Corridor in the City of Lebanon to Rymes Heating Oils Inc. ( | $11,750 | approved | |
| 04/08/20 | #22A | Authorize the Bureau of Construction to enter into a contract with C.W. Sliter & Sons LLC d/b/a CWS Fence & Guardrail Co., Andover, NH, for guardrail replacement in Districts 1 and 3, on the basis of | C.W. Sliter & Sons LLC d/b/a C | $1.3M | approved |
| 04/08/20 | #22B | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing of 29.5 miles of roadways in 10 towns in District 2 in Grafton and Sullivan Counti | Pike Industries Inc. | $2.1M | approved |
| 04/08/20 | #22C | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing of approximately 29 miles of roadways in 7 towns in District 2, on the basis of a | Pike Industries Inc. | $2.9M | approved |
| 04/08/20 | #22D | Authorize the Bureau of Construction to enter into a contract with GMI Asphalt LLC, Belmont, NH, for resurfacing of approximately 25 miles of roadways in District 1, on the basis of a low bid of $2,20 | GMI Asphalt LLC | $2.2M | approved |
| 04/08/20 | #22E | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing of approximately 77 miles of various Tier 2, 3, and 4 roadways in District | Continental Paving Inc. | $4.3M | approved |
| 04/08/20 | #22F | Authorize the Bureau of Construction to enter into a contract with GMI Asphalt LLC, Belmont, NH, for resurfacing of approximately 21 miles of various Tier 2, 3, and 4 roadways in District 3, on the ba | GMI Asphalt LLC | $2.5M | approved |
| 04/08/20 | #22G | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing of approximately 38 miles of various Tier 2, 3, and 4 roadways in District 1, on t | Pike Industries Inc. | $2.9M | approved |
| 04/08/20 | #22H | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing of approximately 25 miles of various Tier 2, 3, and 4 roadways in District | Continental Paving Inc. | $2.6M | approved |
| 04/08/20 | #22I | Authorize the Bureau of Construction to enter into a contract with Continental Paving Inc., Londonderry, NH, for resurfacing of approximately 49 miles of various Tier 2, 3, and 4 roadways in District | Continental Paving Inc. | $5.1M | approved |
| 04/08/20 | #22J | Authorize the Bureau of Materials & Research to utilize remaining approved Capital Funds with ExeVision Inc., Orem, UT, for replacing and upgrading the Department’s computer software based Project Dev | ExeVision Inc. | $5.8M | approved |
| 03/25/20 | #21 | Authorize the Division of Operations to establish non-budgeted class in an accounting unit and to transfer $983,000 between various accounts and classes. Effective upon G&C approval through June 30, 2 | $983,000 | approved | |
| 03/25/20 | #22 | Authorize the Bureau of Right of Way to pay property owners $20,791.60 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from February 14, 2020 thr | $20,792 | approved | |
| 03/25/20 | #23 | NOT USED | not_used | ||
| 03/25/20 | #24 | Authorize the Bureau of Construction to enter into a contract with C.L.H. & Son Inc., Auburn, ME, for culvert repair under the I-93 northbound off ramp to I-89 in Bow, on the basis of a low bid of $28 | C.L.H. & Son Inc. | $289,664 | approved |
| 03/25/20 | #25 | Authorize the Bureau of Turnpikes to enter into an agreement with HNTB Corporation, Concord, NH, for preliminary and final design for conversion of the existing Spaulding Turnpike (NH 16) mainline tol | HNTB Corporation | $1.3M | approved |
| 03/25/20 | #26 | Authorize the Bureau of Transportation Systems Management and Operations to enter into an agreement with WSP USA Inc., Merrimack, NH, for on-call engineering and support services for Intelligent Trans | WSP USA Inc. | $1.0M | approved |
| 03/11/20 | #20 | Authorize the Executive Office to pay membership dues retroactively in the amount of $31,365.73 for the period of January 1, 2020 through December 31, 2020 to the American Association of State Highway | $31,366 | approved | |
| 03/11/20 | #21 | Authorize the Bureau of Right of Way to pay a property owner $22,800 as documented in the Contemplated Awards List for amounts greater than $5,000 for the period extending from February 5, 2020 throug | $22,800 | approved | |
| 03/11/20 | #22 | Authorize the Bureau of Right of Way to sell a 10.95 +/- acre parcel of State owned land located on the easterly side of US Route 4 in the Town of Andover to the Town of Andover for $49,000 plus the $ | $49,000 | approved | |
| 03/11/20 | #23 | Authorize the Bureau of Aeronautics to accept funding for the Federal Aviation Administration (FAA) State Block Grant Program to fund airport planning and development projects at the airports as detai | $9.1M | approved | |
| 03/11/20 | #24 | Authorize the Bureau of Construction to enter into an agreement with the City of Claremont, to provide funding and services under the Federal Aid Highway Program, for an amount totaling $551,091.79. E | Weaver Brothers Construction C | $551,092 | approved |
| 03/11/20 | #25 | Authorize the Bureau of Construction to enter into a contract with R.M. Piper Inc., Plymouth, NH, for bridge preservation work on 3 bridges in Plymouth and Campton, NH, on the basis of a low bid of $1 | R.M. Piper Inc. | $1.7M | approved |
| 03/11/20 | #26 | Authorize the Bureau of Materials and Research to enter into an agreement with R.W. Gillespie & Associates Inc., Biddeford, ME, for the purposes of providing materials testing and construction inspect | R.W. Gillespie & Associates In | $500,000 | approved |
| 03/11/20 | #27 | Authorize the Bureau of Construction to enter into a retroactive contract amendment with CPM Constructors Inc., Freeport, ME (originally approved by G&C on 1-13-16, item #26), for the Keene-Swanzey br | approved | ||
| 03/11/20 | #28 | Authorize the Bureau of Construction to enter into a contract with Vermont Recreational Surfacing & Fencing Inc., Barnet, VT, for guardrail replacement in Districts 1 and 3 (East), on the basis of a l | Vermont Recreational Surfacing | $1.0M | approved |
| 02/19/20 | #14 | Authorize the Division of Operations to transfer $7,310,000 from the Highway Surplus Account to fund winter maintenance activities. Effective upon G&C approval through June 30, 2020. 100% Highway Fund | $7.3M | approved | |
| 02/19/20 | #15 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Advance Transit Inc., Wilder, VT (originally approved by G&C on 5-15-19, item #37L), to increase the amount by $69,564 fr | $4.0M | approved | |
| 02/19/20 | #16 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with the VNA @ HCS (VNA), Keene, NH (originally approved by G&C on 6-5-19, item #45), to increase the amount by $17,392 from $ | $620,392 | ||
| 02/19/20 | #17 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with Community Action Program Belknap-Merrimack Counties Inc., Concord, NH (originally approved by G&C on 6-5-19, item #44), t | $1.6M | approved | |
| 02/19/20 | #18 | Authorize the Bureau of Rail & Transit to enter into a contract amendment with the Southwestern Community Services, Keene, NH (originally approved by G&C on 6-5-19, item #47), to increase the amount b | $633,652 | approved | |
| 02/19/20 | #19 | NOT USED | not_used | ||
| 02/19/20 | #20 | Authorize Asset Management Performance and Strategies to enter into an agreement with Deighton Associates Limited, Ontario, Canada, for the procurement of SaaS services to provide an configure an Asse | $975,599 | approved | |
| 02/19/20 | #21 | Authorize the Bureau of Highway Design to enter into a Municipal Agreement with the Town of Londonderry to allow the Department to bill Londonderry for costs associated with improvements to the inters | Town of Londonderry | approved | |
| 02/19/20 | #22 | Authorize to accept and place on file the Bureau of Highway Design’s annual summary of Special, Supplemental, and Account Agreements (and their amendments) with utilities, municipalities and railroad | approved | ||
| 02/19/20 | #23 | Authorize the Bureau of Construction to enter into a contract with Evroks Corporation, Northfield, NH, for bridge preservation on the 5-span US 302 bridge over I-93 at Exit 42 in Littleton, on the bas | Evroks Corporation | $1.3M | approved |
| 02/19/20 | #24 | Authorize the Bureau of Construction to enter into a contract with E.D. Swett Inc., Concord, NH, for bridge preservation work in Boscawen, NH, on the basis of a low bid of $1,647,611.50. (2)Further au | E.D. Swett Inc. | $1.6M | approved |
| 02/19/20 | #25 | Authorize the Bureau of Construction to enter into a contract with Brox Industries Inc., Dracut, MA, for roadway resurfacing in 8 towns in Districts 5 and 6, on the basis of a low bid of $5,362,536.46 | Brox Industries Inc. | $5.4M | approved |
| 02/19/20 | #26 | Authorize the Bureau of Construction to enter into a contract with Pike Industries Inc., Belmont, NH, for resurfacing and crack sealing roadways throughout 4 towns in District 5, on the basis of a low | Pike Industries Inc. | $7.8M | approved |
| 02/19/20 | #27 | Authorize the Bureau of Construction to enter into a contract with Brox Industries Inc., Dracut, MA, for roadway resurfacing four Tier 2 roads in District 6, on the basis of a low bid of $3,785,660.97 | Brox Industries Inc. | $3.8M | approved |
| 02/19/20 | #27A | Authorize the Bureau of Turnpikes to transfer funds in the amount of $336,000 from the Turnpike General Reserve Account to budget and expend revenue for costs associated with winter maintenance, telec | $336,000 | approved | |
| 02/19/20 | #27B | Authorize the Bureau of Right of Way to lease a 13,438 square foot parcel of State owned land located at the southeast quadrant of the Interstate 93 Exit 12 Interchange in the City of Concord to Capit | $11,250 | approved | |
| 02/05/20 | #14 | Authorize the Bureau of Right of Way to pay property owners $65,420 as documented in the Contemplated Awards List, for amounts greater than $5,000 for the period extending from December 26, 2019 throu | $65,420 | approved | |
| 02/05/20 | #15 | Authorize the Bureau of Rail & Transit to pay the Manchester Transit Authority, Manchester, NH, an amount not to exceed $86,958 to provide a portion of the non-Federal Funds required to match Federal | $86,958 | approved | |
| 02/05/20 | #16 | Authorize the Bureau of Rail & Transit to pay the Cooperative Alliance for Seacoast Transportation, Dover, NH, an amount not to exceed $69,566 to provide a portion of the non-Federal Funds required to | $69,566 | approved |